Shadow Lake II

Page 1

SHADOW LAKE 2 SUBDIVISION AGREEMENT

THIS AGREEMENT made this __ day of ___, 2017, by and between SHADOW LAKE 2, LLC, a Nebraska limited liability company (hereinafter referred to as “DEVELOPER”), SANITARY AND IMPROVEMENT DISTRICT NO. 326 OF SARPY COUNTY, NEBRASKA (hereinafter referred to as “DISTRICT”), and the CITY OF PAPILLION, a municipal corporation (hereinafter referred to as “CITY”).

RECITALS:

DEVELOPER is the owner of the parcel of land described in Exhibit A, attached hereto, which area to be developed is within CITY’s zoning and platting jurisdiction; and

DEVELOPER has requested CITY to approve a specific platting of the area to be developed, known as Shadow Lake 2, as depicted in the Final Plat exhibit attached as Exhibit B (included within the definition of “Development Area”); and

DEVELOPER wishes to connect the sewer and water systems to be constructed by DISTRICT within the Development Area with the sewer and water systems of CITY; and

DEVELOPER, DISTRICT, and CITY wish to agree upon the manner and the extent to which public funds may be expended in connection with the Public Improvements serving the Development Area and the extent to which the contemplated Public Improvements shall specifically benefit property in the Development Area and adjacent thereto and to what extent the Cost of the same shall be specially assessed.

NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:

Section 1

Definitions

A. For this Agreement, unless the context otherwise requires, the following words and phrases shall have the following meanings:

1

(1) “Cost(s)” or “Entire Cost”, being used interchangeably, of each Private Improvement or Public Improvement shall mean all construction costs, acquisition of off-site public easements, engineering fees, design fees, attorneys’ fees, inspection fees, testing expenses, publication costs, municipal advisory fees, underwriting fees, financing costs (which shall include interest), and all other related or miscellaneous costs or expenses incurred by DISTRICT or DEVELOPER in connection with any Private Improvements or Public Improvements.

(2) “Dedicated Street(s)” shall mean those areas, including curbing, turn lanes, and all corresponding concrete paving to be constructed, modified, or improved within: (1) that portion of the Development Area designated as Dedicated Street right-of-way (or similar terminology) on Exhibit B, (2) 72nd Street right-of-way, (3) Capehart Road right-of-way, (4) 75th Street right-of-way adjacent to the area platted as Shadow Lake 2, (5) 77th Street right-of-way adjacent to the area platted as Shadow Lake 2, and (6) any other areas to be dedicated as right-of-way pursuant to any future replat(s) of the Development Area.

(3) “Development Area” shall mean the real property situated within the area identified or depicted as such in Exhibit B, including all Dedicated Streets.

(4) “Final Plat” shall mean the final plan of the plat, subdivision, or dedication of land, attached as Exhibit B.

(5) “Frontage” shall mean the entire length of the Development Area or individual lot property line, as referenced herein, that abuts a particular public street, road, or intersection.

(6) “Party”, when capitalized, shall mean CITY, DEVELOPER or DISTRICT, individually, and “Parties”, when capitalized, shall mean CITY, DEVELOPER, and DISTRICT, collectively.

(7) “Privately Financed Public Improvement(s)” shall mean those improvements or betterments identified in Section 2 to be installed and constructed at the sole cost and expense of DEVELOPER, as permitted by Section 6, in lieu of DISTRICT causing the installation and construction of such improvements or betterments using the credit or funds of DISTRICT.

(8) “Private Improvement(s)” shall mean those improvements or betterments required by, or otherwise undertaken by, DEVELOPER pursuant to this Agreement on, to, or otherwise benefiting the Development Area that shall be privately financed by DEVELOPER because they are not eligible for financing using the credit or funds of DISTRICT

(9) “Property Specially Benefited” shall mean property benefited by a particular Public Improvement and situated either: (1) within the platted area in which the Public Improvement is situated or (2) outside such platted area in which such

2

Public Improvement is situated but within the corporate limits of DISTRICT and within 300 feet of said platted area.

(10) “Proportional Cost Sharing” or “Proportional Cost Share” shall mean that the responsibility for the Entire Cost of a particular public street, intersection, sidewalk, traffic signal, or other applicable Public Improvement(s), as specifically identified in this Agreement or in an amendment to this Agreement, as applicable, less any amount contractually assumed by a local governmental entity, shall, by default, be divided among all fronting developments proportional to said developments’ Frontage to said public street or intersection. The default proportionality of said division may be adjusted by a corresponding construction agreement among all requisite parties that specifically addresses the responsibility for the Entire Cost of a particular public street, intersection, traffic signal, or other applicable Public Improvements.

(11) “Public Improvements” shall mean those acquisitions, improvements, betterments, or associated fees contemplated by this Agreement that are eligible for financing using the credit or funds of DISTRICT as defined in Section 2 of this Agreement.

(12) “Street Intersection(s)” shall mean the area of the street between the returns of the various legs of the intersection, but in no case shall said area extend in any direction beyond a straight line drawn perpendicular from the centerline of the street to the adjacent lot corner

(13) “Warranted” shall refer to the status of an applicable Public Improvement, as specifically and exclusively referenced in Section 2(A)(14), Section 5(A)(14), Section 10(L) and Section 10(M) of this Agreement, once certain criteria are met. Specifically, any such Public Improvement shall be considered Warranted as soon as any of the following occurs: (1) it is deemed so by a third-party review of a Traffic Impact Study, (2) CITY’s promotion of public health, safety, and welfare is negatively impacted in an unforeseen manner as a direct result of the development and uses of the Development Area and the construction and installation of such Public Improvement would likely mitigate said negative impact or prevent said negative impact from reoccurring, or (3) Sarpy County or any other governmental agency with jurisdiction over the Dedicated Street(s) deems that the construction and/or installation of such Public Improvement, including but not limited to Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices as defined in Section 2A(5) and Section 2(A)(14), associated with the Dedicated Streets, including intersections, is necessary to promote public health, safety, and welfare.

Section 2

Public Improvements and Related Terms

A. Public Improvements. The following Public Improvements and associated fees shall be required for the development of the Development Area:

3

(1) Capital Facilities Charges Capital facilities charges to CITY as provided for in CITY’s Master Fee Schedule (“Master Fee Schedule”).

(2) Civil Defense and Storm Warning System. A civil defense and storm warning system, if necessary.

(3) Dedicated Street Construction Construction of all Dedicated Streets, as shown on the Streets and Walks exhibit attached as Exhibit C including improvements within the: (1) 72nd Street right-of-way, (2) Capehart Road right-of-way, (3) 75th Street right-of-way adjacent to the area platted as Shadow Lake 2, and (4) 77th Street right-of-way adjacent to the area platted as Shadow Lake 2.

(4) Dedicated Street Right-of-Way Grading. Grading of Dedicated Street right-ofway which, by this definition, excludes initial site grading.

(5) Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices. All Dedicated Street signage, traffic control signs, and traffic control devices required by, and meeting the standards of, the “Manual of Uniform Traffic Control Devices,” but only if first approved in writing by CITY’s Public Works Director or the City Engineer and only if located at a Street Intersection or related to the Development Area.

(6) Electrical Power Service. The Electrical Power Service to be constructed and installed by the Omaha Public Power District (“OPPD”) within the boundaries of any Dedicated Street right-of-way or OPPD easements within the Development Area. The Electrical Power Service shall include all electrical utility lines and other devices, other than the Lighting System, so constructed and installed for the benefit of the Development Area.

(7) Emergency Vehicle Preemption. Emergency Vehicle Preemption device(s) to be installed on traffic signal arm(s)

(8) Gas Distribution System. The “Gas Distribution System” to be constructed and installed by Black Hills Energy, Inc. within any Dedicated Street right-of-way within the Development Area or other areas specifically approved by CITY.

(9) Lighting System. The “Lighting System” for any Dedicated Streets to be constructed and installed by OPPD within the boundaries of any Dedicated Street right-of-way within the Development Area, including any decorative, ornamental, or other lighting not conforming to CITY standards but which has been specifically approved by CITY.

(10) Sanitary Sewer Lines, Water Mains, and Appurtenances. All sanitary sewer lines, water mains, and appurtenances constructed within Dedicated Street rightof-ways or easements, as shown in Exhibit D, pursuant to sanitary sewer and water plans heretofore prepared by DISTRICT’s engineer, consulting engineers, and land surveyors.

4

(11) Sediment Erosion Control and Detention (or Stormwater Detention). Permanent stormwater detention basins on and off site as shown in Exhibit E. Permanent piping for sediment basin and detention ponds.

(12) Sidewalks and Trails. The five foot (5’) sidewalks within the: (1) right-of-way abutting all outlots, (2) Capehart Road right-of-way, (3) 75th Street right-of-way adjacent to the area platted as Shadow Lake 2, and (4) 77th Street right-of-way adjacent to the area platted as Shadow Lake 2, and the ten foot (10’) wide trail within 72nd Street right-of-way, as shown in Exhibit F

(13) Storm Sewers, Inlets, and Appurtenances. All storm sewers, inlets, and appurtenances constructed within Dedicated Street right-of-ways or easements within the Development Area, as shown in Exhibit C.

(14) Traffic Signal at 72nd Street and Capehart Road A traffic signal located at 72nd Street and Capehart Road should such signal be deemed Warranted pursuant to Section 10(M)

Section 3 Standards, Authority, and Documentation

A. Standards for Private Improvements and Public Improvements. DEVELOPER, DISTRICT, and their respective successors and assigns, as applicable, shall cause all Private Improvements and Public Improvements to be acquired, constructed, and installed, as applicable, in accordance with the terms and conditions of this Agreement.

B. Adherence and Construction Contracts. DISTRICT and DEVELOPER shall abide by, and incorporate into all of their construction contracts for the Private Improvements and Public Improvements, as applicable, the provisions required by the regulations of Sarpy County and CITY, as applicable, pertaining to construction of the Private Improvements and Public Improvements in developments/subdivisions and testing procedures. Said contracts shall also provide that the contractor(s) or subcontractor(s) constructing or installing the Private Improvements and Public Improvements shall have no recourse against CITY or DISTRICT for any Costs, claims, or matters arising out of, or related to in any way whatsoever, said construction or installation including, without limitation, the Cost for the Private Improvements and Public Improvements, construction oversight of the Private Improvements and Public Improvements, or the design or preparation of plans and specifications for the Private Improvements and Public Improvements.

C. Before Commencing Work on Public Improvements Before commencing any work in connection with any individual Public Improvement, DEVELOPER or DISTRICT, as applicable, shall first:

(1) Make payment for all applicable fees due to CITY in relation to said construction and installation of said individual Public Improvement;

5

(2) Obtain approval from Sarpy County and CITY, as applicable, for the specifications and technical terms of any agreement(s) or plan(s) for, or relating to, the construction or installation of said individual Public Improvement prior to DEVELOPER’s or DISTRICT’s execution of any such agreement(s) or plan(s), as applicable. Once DEVELOPER or DISTRICT obtains approval from Sarpy County and CITY, as applicable, DEVELOPER or DISTRICT shall deliver to the Papillion City Clerk duly executed copies of any agreement(s) or plan(s) for work required for, or otherwise entered into in connection with, said individual Public Improvement. Such agreement(s) or plan(s) shall include, but not be limited to, any required bonds, insurance certifications, and all plans for said individual Public Improvement. Any such agreement(s) or plan(s) shall contain details describing the manner and means of any additional connections required by or for the Wastewater Sewer System or the Storm Sewer System prepared by DEVELOPER’s or DISTRICT’s engineer;

(3) Obtain and file of record any permanent easements required by CITY for said individual Public Improvement, as applicable, if not located on or in dedicated public right-of-way. Public Improvements which may invoke this requirement may include, but shall not necessarily be limited to, sanitary and wastewater sewer, storm sewer, water lines, and Post-Construction Stormwater Management, including all appurtenances, as determined by the City Engineer. Said easements shall be prepared and filed in a form satisfactory to CITY and DISTRICT;

(4) For Privately Financed Public Improvements, DEVELOPER shall obtain, and show proof of, general liability insurance and payment and performance bonds equivalent to the total construction cost for said Privately Financed Public Improvement; and

(5) Obtain final approval from CITY to commence the construction and installation of said Public Improvement.

D. All Necessary Agreements, Permits, and Approvals. Prior to commencing any work within any public right(s)-of-way, DEVELOPER or DISTRICT, as applicable, shall enter into all necessary right-of-way agreements and obtain all necessary permits and approvals from all requisite governmental entities exercising authority over said right(s)of-way. In the event CITY requests copies of any such agreements, permits, or approvals, DEVELOPER or DISTRICT, as applicable, shall provide said copies to CITY in a timely manner.

E. No Credit of CITY. The Entire Cost of all Private Improvements and Public Improvements to be constructed within the Development Area shall be borne by, and be at the sole expense of, DEVELOPER or DISTRICT. The credit of CITY shall not be used for engineering, procurement, or construction of any betterments, Private Improvements, Public Improvements, or any other Costs related to the installation and construction of the Private Improvements or Public Improvements within the Development Area.

6

F. No Final Payment Until Approved. For any Public Improvement, DISTRICT or DEVELOPER, as applicable, shall forward all weekly construction tests and observation logs for the Public Improvement to the City Engineer. No final payment shall be made to the contractor for said Public Improvement until such final payment has been approved by the City Engineer, which approval shall not be unreasonably withheld or delayed

Section 4

Use of DISTRICT Credit or Funds

A. Use of DISTRICT Credit or Funds. The credit or funds of DISTRICT shall not be used for the construction of any improvements or facilities within the Development Area except those Public Improvements specified in this Agreement. By way of specification, and not by way of limitation, the Parties agree that DISTRICT shall not, other than as provided in this Agreement, incur any indebtedness or otherwise involve its credit or expend any of its funds in the construction or other acquisition or improvement of any swimming pool, golf course, park, playground, or other recreational facility without approval by Resolution of City Council.

B. The Cost of the Public Improvements. The Cost of the Public Improvements constructed by DISTRICT within the Development Area shall be defrayed as agreed herein and as identified in Exhibit G attached hereto and incorporated herein by this reference as the Source and Use of Funds. In no case shall the actual total general obligation costs of DISTRICT exceed the amount shown as the approved total general obligation amount on the “Order of Magnitude Cost Estimate” page of Exhibit G (the “Required Amount”) at the time of levy of special assessments. Special assessments shall be increased if necessary to reduce the actual total general obligation costs to the Required Amount

C. No Reallocation. In the event any funds allocated for Public Improvements, pursuant to Exhibit G, do not get expended by DISTRICT due to private financing by DEVELOPER, DISTRICT agrees that such unexpended funds shall not be reallocated for any other Public Improvement or other expense without prior approval from CITY.

D. Construction Overruns or Change Orders. Construction overruns, change orders, or both totaling ten percent (10%) or more of any individual contract, as described in Exhibit G, shall be submitted to CITY for approval prior to the work being started. If the work is approved by both the City Administrator and the City Engineer, the Entire Cost of the work may be added to the relevant construction contract and shall require an executed modification to this Agreement prior to the work being started on such construction overruns and/or change orders. If the work is not approved by the City Administrator and the City Engineer, the Cost of the work shall be included in the statements of cost and specially assessed evenly against DISTRICT’s assessable property or the cost of the work shall be privately financed.

7

Section 5 Apportionment of Costs and Related Terms

A. Apportionment of Costs and Additional Terms.

(1) Capital Facilities Charges The Parties acknowledge that CITY’s Capital Facilities Charges are charged on a per lot basis for residential lots and on a per acre basis for outlots and function as a contribution toward existing or future facilities necessary to meet the service needs of new customers. Accordingly, the Entire Cost of all Capital Facilities Charges shall be subject to the following terms:

i. Fee Amount. Capital Facilities Charges shall be paid to CITY according to the following calculations:

a. Lots 1 – 181, Outlots A–I. DISTRICT shall pay to CITY Capital Facilities Charges in the amount of $478,073.50 based on 181 single-family residential lots at $2,285 per lot ($413,585.00) plus 10.1 acres of outlots at $6,385 per acre ($64,488.50).

ii. Special Assessments Not less than fifty percent (50%) of gross Capital Facilities Charges invoiced by CITY shall be specially assessed against property served. The remaining balance may be privately financed by DEVELOPER or borne by general obligation of DISTRICT.

iii. Invoicing and Payment Deadline CITY shall issue the invoice for the foregoing Capital Facilities Charges identified under Section 5(A)(1)(i)(a) upon CITY’s execution of this Agreement. One hundred percent (100%) of all such Capital Facilities Charges shall be paid by DISTRICT to CITY no later than 60 days after the invoice issuance date. In the event that Capital Facilities Charges are not paid within 60 days after the invoice issuance date, then the total Capital Facilities Charges amount contemplated herein shall be recalculated based on the amount set forth in the Master Fee Schedule at the time the Capital Facilities Charges fee amount is paid in full. Any cost differential in the Capital Facilities Charge that results due to said charge not being remitted by DISTRICT to CITY within 60 days after issuance of the invoice shall be specially assessed or paid privately. Such cost differential shall not be a general obligation cost.

iv. Building Permits Parties acknowledge that CITY shall not issue building permits until after all applicable Capital Facilities Charges have been paid in full to CITY

v. Construction Document Reviews. Parties acknowledge that CITY shall not accept or review any construction documents for any Public Improvements or Private Improvements until after all applicable Capital Facilities Charges have been paid in full to CITY.

8

(2) Civil Defense Siren and Storm Warning System If civil defense and storm warning coverage for the entire Development Area is not already available, such sirens shall be installed prior to the issuance of any occupancy permit for any structure built in the Development Area. The number, type, and specifications of said defense sirens shall be determined by the City Administrator in conjunction with the Director of the Sarpy County Civil Defense Agency One hundred percent (100%) of the Cost for said civil defense sirens shall be borne by general obligation of DISTRICT or privately financed by DEVELOPER. If existing coverage is available, DISTRICT shall pay one hundred percent (100%) of its pro-rata share of the siren Cost based on the areas of coverage as determined by the City Engineer.

(3) Dedicated Street Construction. One hundred percent (100%) of the Entire Cost of all Dedicated Street construction shall be paid by special assessment against the Property Specially Benefited, except that the following Costs may be borne by general obligation of DISTRICT:

i. One hundred percent (100%) of the Cost of the concrete paving and construction of Street Intersections;

ii. One hundred percent (100%) of the Cost differential for pavement thickness in excess of six inches (6”) for reinforced concrete or seven inches (7”) for plain concrete;

iii. One hundred percent (100%) of the Cost differential for pavement width in excess of twenty-five feet (25’) inclusive of curb and gutters;

iv. One hundred percent (100%) of the Cost of the improvements to 72nd Street and Capehart Road, identified as “Paving Major – 72nd & Capehart” on Exhibit G.

The Cost for curb and gutters are incidental to paving and shall not be considered separately for purposes of assessment.

(4) Dedicated Street Right-of-Way Grading. One hundred percent (100%) of the Entire Cost of Dedicated Street right-of-way grading, including Street Intersections, shall be privately financed by DEVELOPER, except that the Entire Cost of the grading associated with coring of streets and backfilling after paving may be borne by general obligation of DISTRICT. One hundred percent (100%) of the Entire Cost for coring of streets and backfilling shall be specially assessed against the Property Specially Benefited within the Development Area, except that the Cost for coring and backfilling streets with a width in excess of twenty-five feet (25’) inclusive of curb and gutters and Street Intersections may be borne by general obligation of DISTRICT or privately financed by DEVELOPER. As provided under Section 2A(4), the definition of Dedicated Street Right-of-Way Grading excludes initial site grading. Initial site grading shall be completed and paid for privately by DEVELOPER and shall include adjacent or abutting street right-of-way.

9

(5) Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices

One hundred percent (100%) of the Cost of Dedicated Street signage, traffic control signs, traffic control devices, and installation, as applicable, shall be borne by general obligation of DISTRICT, specially assessed against the Property Specially Benefited within the Development Area, or privately financed by DEVELOPER. DISTRICT shall also be responsible for installation of all such signage and devices.

(6) Electrical Power Service One hundred percent (100%) of the contract charges for Electrical Power Service authorized to be paid by DISTRICT to the Omaha Public Power District (“OPPD”) by this Agreement, including both the basic charges and refundable charges, together with all other charges as fall within the definition of Entire Cost, including all penalties and default charges that are allocable to such contract charges, shall be specially assessed against Property Specially Benefited within the Development Area. One hundred percent (100%) of the Cost differential for underground installation in lieu of above ground installation shall be specially assessed against the Property Specially Benefited within the Development Area or privately financed by DEVELOPER

(7) Emergency Vehicle Preemption. One hundred percent (100%) of the Cost of Emergency Vehicle Preemption device procurement and installation on the requisite traffic signal arm(s) for Dedicated Streets shall be borne by general obligation of DISTRICT, specially assessed against the Property Specially Benefited within the Development Area, or privately financed by DEVELOPER

(8) Gas Distribution System. One hundred percent (100%) of the contract charges for the Gas Distribution System authorized to be paid by DISTRICT to any public gas utility by this Agreement, including both the basic charges and refundable charges, together with all other charges as fall within the definition of Entire Cost, including all penalties and default charges that are allocable to such contract charges, shall be specially assessed against Property Specially Benefited within the Development Area. One hundred percent (100%) of the Cost differential for underground installation in lieu of above ground installation shall be specially assessed against the Property Specially Benefited within the Development Area or privately financed by DEVELOPER.

(9) Lighting System One hundred percent (100%) of the contract charges to be paid to OPPD for the Lighting System to be constructed and installed within the boundaries of any Dedicated Street, including any decorative, ornamental, or other lighting not conforming to CITY standards but which has been specifically approved by CITY, shall be borne by general obligation of DISTRICT or privately financed by DEVELOPER.

(10) Sanitary Sewer Lines, Water Mains, Water Lines, and Appurtenances. One hundred percent (100%) of the Entire Cost of all sanitary sewer lines, water mains, water lines, and appurtenances located within the Development Area shall be paid by special assessment against the Property Specially Benefited, except

10

that the following Costs may be borne by general obligation of DISTRICT or privately financed by DEVELOPER:

i. The Cost differential for the portion of sanitary sewers in excess of eight inches (8”) and water mains in excess of eight inches (8”) including valves and appurtenances in excess of eight inches (8”); and

ii. One hundred percent (100%) of the Entire Cost of any outfall sewer lines, water mains, water lines, or appurtenances outside the Development Area.

Pursuant to Papillion Mun. Code § 170-20, one hundred percent (100%) of the Cost of fire hydrants shall be provided by DEVELOPER. The type of hydrants and control valves and the location of the hydrants must be approved by the City Engineer before installation.

(11) Sediment Erosion Control and Detention (or Stormwater Detention). Temporary Sediment Basins and Permanent Detention Basins used for stormwater detention are planned for the subdivision as shown on the attached Exhibit E. Permanent Detention Basins are initially used as Temporary Sediment Basins until such time that the area draining into the basin is developed. DEVELOPER covenants and agrees that it shall assume the sole obligation for the construction of the Temporary Basin(s) and the maintenance thereof during the mass grading of the Development Area including sediment removal from basins and traps. Costs shall be defrayed as follows:

i. One hundred percent (100%) of the Cost of the grading and maintenance of the Permanent Basins during the mass grading shall be performed and paid for by DEVELOPER

ii. One hundred percent (100%) of the Cost of the permanent piping shall be borne by general obligation of DISTRICT or privately financed by DEVELOPER.

iii. After completion of the mass grading, one hundred percent (100%) of the Cost of the ongoing maintenance of removing accumulated sediment, as may be required for both the Temporary and Permanent Basins, may be borne by general obligation of DISTRICT or privately financed by DEVELOPER until such time as the Public Improvements serviced by each basin have been completed. DEVELOPER, its successors, and assigns shall be responsible for the Permanent Basins once they have served their purpose as Temporary Basins and maintenance shall be in compliance with the Post-Construction Stormwater Management requirements of CITY. Ownership and maintenance responsibilities for any existing Temporary and Permanent Basins shall be transferred to the Shadow Lake 2 Homeowners Association prior to annexation by CITY.

iv. One hundred percent (100%) of the Costs for landscaping the Permanent Detention Basins shall be the responsibility of DEVELOPER.

11

v. One hundred percent (100%) of the Costs associated with Temporary Sediment Basin closures shall be the responsibility of DEVELOPER.

The engineers for DISTRICT shall notify CITY when, in their professional opinion, the basins and traps are no longer required as a sediment trap. CITY, DEVELOPER, and DISTRICT shall make a mutual determination that the above provisions have been met, and at such time, DEVELOPER, its successors, and assigns shall assume all maintenance responsibilities.

(12) Sidewalks and Trails. One hundred percent (100%) of the Entire Cost of the sidewalk and trail installation may be borne by general obligation of DISTRICT or privately financed by DEVELOPER

(13) Storm Sewers, Inlets, and Appurtenances. One hundred percent (100%) of the Entire Cost of all storm sewers, inlets, and appurtenances shall be borne by general obligation of DISTRICT or privately financed by DEVELOPER, except that the Cost differential for the portion of the storm sewer in excess of a forty-eight inch (48”) inside diameter shall be specially assessed against the Property Specially Benefited within the Development Area or privately financed by DEVELOPER. Difference in Cost shall include a proportionate share of the entire Cost. For improved channels, the Cost of constructing the channel and appurtenances shall be considered as the Cost of storm sewer in excess of a fortyeight inch (48”) inside diameter. Culvert crossings perpendicular to street center lines shall be borne by general obligation of DISTRICT for a length not exceeding the width of the right-of-way, plus six (6) times the vertical distance between the centerline of the pavement and the invert elevation of the box culvert. All costs of culverts, headwalls and associated improvements with culverts may be borne by general obligation of DISTRICT or privately financed by DEVELOPER.

(14) Traffic Signal at 72nd Street and Capehart Road In the event that a traffic signal is deemed Warranted at 72nd Street and Capehart Road, one hundred percent (100%) of DISTRICT’s Proportional Cost Share for the traffic signal at 72nd Street and Capehart Road and any associated improvements may be borne by general obligation of DISTRICT or privately financed by DEVELOPER.

Section 6

Privately Financed Public Improvements and Related Terms

A. Privately Financed Public Improvements. DEVELOPER, at its sole discretion, may cause one or more of the Public Improvements to be installed and constructed at the sole Cost and expense of DEVELOPER (“Privately Financed Public Improvements” as defined in Section 1) in lieu of DISTRICT causing the installation and construction of such Public Improvements using the credit or funds of DISTRICT In such an event, the following terms shall also apply:

(1) Notice of Intent DEVELOPER must provide written notice to CITY of its intent to privately install and construct the applicable Public Improvements.

12

(2) Ownership and Maintenance All such Privately Financed Public Improvements shall become the unencumbered assets of DISTRICT immediately upon completion or installation of each Privately Financed Public Improvement and shall be maintained by DISTRICT to the same standard as the Public Improvements until such time that DISTRICT is annexed by CITY.

(3) Insurance. For any Privately Financed Public Improvement, DEVELOPER shall cause CITY to be named as an additional insured under any policy of insurance, including all payment and performance bonds obtained by DEVELOPER (whether or not required by this Agreement) or any other person in connection with the construction or operation of the Privately Financed Public Improvements. Additionally, DEVELOPER shall cause DISTRICT to be named as an additional insured under any policy of insurance, including all payment and performance bonds obtained by DEVELOPER in connection with the construction or operation of the Privately Financed Public Improvements.

(4) Sole Cost of DEVELOPER The Entire Cost of all Privately Financed Public Improvements shall be paid by, and be at the sole expense of, DEVELOPER.

(5) No Final Payment Until Approved For any Privately Financed Public Improvement, DEVELOPER shall forward all weekly construction tests and observation logs to the City of Papillion Public Works Director and the City Engineer. No final payment shall be made to the contractor until such final payment has been approved by the City Engineer.

(6) All Other Public Improvement Requirements Shall Apply. All other requirements contained in this Agreement, or required by law, which relate to the acquisition, construction, and installation of the Public Improvements shall also apply unless explicitly stated otherwise.

Section 7

General Obligation Professional Services Fees

A. Professional Service Fees. Professional service fees paid on the actual general obligation construction costs of any DISTRICT project associated with the construction and maintenance of public utility lines and conduits, emergency management warning systems (including civil defense and storm warning systems), water mains, sanitary sewers, storm sewers, flood or erosion protection systems (including dikes and levees), sidewalks/trails, streets/roads/highways and traffic signals and signage, street lighting, power, public waterways/docks/wharfs and related appurtenances, and parks/playgrounds/recreational facilities (excluding clubhouses and similar facilities for private entities), landscaping and hardscaping shall be subject to the following:

(1) DISTRICT’s Engineer(s). DISTRICT’s Engineer(s)’ compensation shall be subject to the following:

13

i. For professional engineering, administration, construction, and coordinating services on projects with actual construction costs greater than one hundred and fifty thousand dollars ($150,000), DISTRICT’s Engineer shall be paid on the basis of their actual direct labor costs times their usual and customary overhead rate plus fifteen percent (15%) for profit plus reimbursable costs. In no case shall the foregoing costs paid be greater than twenty-one percent (21%) of the actual general obligation construction costs of any project. Any work performed without CITY’s approval shall be paid for privately or specially assessed.

ii. For professional engineering, administration, construction, and coordinating services on projects with actual construction costs less than one hundred and fifty thousand dollars ($150,000), DISTRICT’s Engineer shall be paid on the basis of their actual direct labor costs times their usual and customary overhead rate plus fifteen percent (15%) for profit plus reimbursable costs. In no case shall the foregoing costs paid be greater than twenty-five percent (25%) of the actual general obligation construction costs of any project. Any work performed without CITY’s approval shall be paid for privately or specially assessed.

iii. Professional engineering, administration, construction, and coordinating services shall include, but not be limited to, the cost for all services in connection with the preliminary and final surveys, geotechnical reports, preliminary and final design, redesign, cost estimates, bid document preparation, including preparation of plans and specifications, analysis and studies, recommendation of award, preparation of progress estimates, preparation of special assessments schedules and plats, certification of final completion, utility coordination, permitting (exclusive of permit fees), testing, construction or resident observation, construction staking, as-built record drawings and surveys, easement exhibits, and legal descriptions, and specialized sub-consultants, as may be necessary for the completion of the project.

iv. Additional service fees may be considered and approved by the Mayor and City Council for any significant redesign work that is requested by CITY but only after final construction plans and procurement documents have been approved in writing by the City Engineer.

v. Fees shall become due no earlier than at the time services are rendered and are approved by DISTRICT’s Board of Trustees.

(2) DISTRICT’s Attorney(s). DISTRICT’s Attorney(s)’ compensation shall be subject to the following:

i. DISTRICT’s Attorney(s)’ compensation for professional services shall be charged to DISTRICT at a cost no greater than five percent (5%) of the actual project construction costs for all services in connection with the

14

commencement, planning, advertisement, meetings, construction, completion of, and levy of special assessments for the construction of Public Improvements installed within DISTRICT. The percentage legal fee may not be charged against those costs associated with engineering fees, fiscal fees, testing, permit fees, or interest payments of DISTRICT.

ii. DISTRICT’s Attorney(s)’ compensation for professional services shall be charged to DISTRICT at a cost no greater than one-half of one percent (0.5%) for bond issuance or subsequent refinancing of DISTRICT on the gross amount of bonds issued.

iii. DISTRICT’s Attorney(s)’ legal fees shall become due no earlier than at the time construction fund warrants or bonds are issued for approved expenditures by DISTRICT’s Board of Trustees.

iv. DISTRICT’s Attorney(s)’ compensation for professional services shall be charged to DISTRICT at a cost no greater than two percent (2%) of the actual project construction costs for all services in connection with contract charges and reimbursable charges, reimbursements or payments to other agencies or contract services for OPPD, Black Hills Energy, CenturyLink, Cox, etc. This shall include, but not be limited to, park land acquisition, capital facilities charges, and accrued interest payments on warrants issued by DISTRICT.

(3) DISTRICT’s Fiscal Agent(s). DISTRICT’s underwriter(s) for the placement of warrants issued by DISTRICT, and municipal advisor(s) or other financial advisor(s) for services during construction, collectively, shall receive fees not to exceed five percent (5%) of warrants issued.

i. Fees shall become due no earlier than at the time construction funds warrants or bonds are issued for approved expenditures by DISTRICT’s Board of Trustees.

(4) Unwarranted or Excessive Costs. All costs not described within this Agreement or otherwise approved by CITY shall be considered unwarranted or excessive and shall be paid for privately or specially assessed evenly among all the assessable lots.

(5) Interest on Construction Fund Warrants Interest on construction fund warrants issued prior to the professional fee schedules outlined above shall be paid for privately or specially assessed evenly among all the assessable lots.

(6) Contracts for Professional Services. DISTRICT shall incorporate the foregoing terms within this section, as applicable, into any contract for Professional Services contemplated herein.

15

Section 8

Covenants, Representations, and Acknowledgments by CITY

A. Covenants by CITY. CITY covenants and agrees that:

(1) CITY and its departments shall reasonably cooperate with DEVELOPER, its agents, and contractors for the timely and orderly installation of the Public Improvements following the execution of this Agreement and submittal of required documents.

(2) DISTRICT may connect its sanitary sewer system and water system to the sanitary sewer system and water system of CITY pursuant to the terms and conditions of a sewer and water connection agreement between CITY and DISTRICT.

B. Representations and Acknowledgements by CITY. CITY represents and acknowledges that:

(1) Neither CITY nor any of its officers, agents, or employees:

i. Is acting as attorney, architect, engineer or otherwise in the interest or on behalf of DEVELOPER or DISTRICT in furtherance of this Agreement;

ii. Owes any duty to DEVELOPER, DISTRICT, or any other person or entity because of any action CITY, DEVELOPER, or DISTRICT has undertaken, or in the future will undertake, in furtherance of this Agreement, including any CITY inspection or CITY approval of any matter related to the same; and

iii. Shall be liable to any person as a result of any act undertaken by CITY, DEVELOPER, or DISTRICT to date, or at any time in the future, in furtherance of this Agreement, and, to the maximum extent permitted by law, DEVELOPER and DISTRICT hereby waive for themselves, their employees, agents, and assigns any such right, remedy, or recourse they may have against any of them

Section 9

Covenants, Representations, and Acknowledgments by DISTRICT

A. Covenants by DISTRICT. DISTRICT covenants and agrees that:

(1) CITY Approval. DISTRICT shall not solicit bids for Public Improvements until after the plans therefor have been approved by the City Engineer, and no construction shall begin, and no contract let, until such time as CITY approves any such bids.

(2) Invoices DISTRICT shall attach copies of all paid invoices to the minutes of the Board of Trustees meetings where payment of such invoices is authorized.

16

(3) Bid Procurement Document Formatting DISTRICT shall format all bid procurement documents to match the format utilized in Exhibit G. No bid authorization shall be provided by CITY until the City Engineer determines that the bid procurement documents are properly formatted.

(4) Prohibitions on Contracts and Payments. DISTRICT shall not contract or pay for any work that is performed by DEVELOPER, or is performed by any company whose principals are related to DISTRICT’s Trustees or DEVELOPER.

(5) Easements. Prior to commencement of construction of the Public Improvements, DISTRICT shall obtain and file of record permanent easements for all sanitary, water, storm sewer lines, and Post-Construction Stormwater Management requirements, including all appurtenances, as determined by the City Engineer.

(6) Itemization After bids for Public Improvements are received and prior to award of said bids, DISTRICT’s Engineer shall provide a document to the City Engineer that details the itemized split of DISTRICT’s general obligation and special assessment costs.

(7) Timing of Special Assessments Special assessments of any DISTRICT project shall be levied upon all specially benefitted lots or parcels of ground within DISTRICT, as applicable, within six (6) months after the final acceptance of the Public Improvements that are subject to special assessment, by DISTRICT’s Board of Trustees or Administrator. All such special assessments shall be levied within eighteen (18) months after commencement of construction or as otherwise provided by Neb. Rev Stat. § 31-751.

(8) Outlots No special assessments shall be assessed against any outlot or dedicated park land. Costs associated with Public Improvements adjacent to or within an outlot (not deemed to be dedicated park land) shall not be borne by general obligation cost, except as provided in Section 5. Such costs shall be specially assessed against all Property Specially Benefited (excluding outlots) within the Development Area.

(9) Prior to Notice of Special Assessments. Prior to publishing notice for any hearing of DISTRICT to be held for the purpose of equalizing or levying special assessments against Property Specially Benefited by any Public Improvements constructed by DISTRICT, DISTRICT shall abide by the following terms:

i. DISTRICT shall obtain written approval from CITY for proposed special assessment schedules. This provision shall not be construed as an obligation incumbent upon CITY to provide such approval, but rather as an obligation incumbent upon DISTRICT to obtain approval from CITY before publishing notice and equalizing or levying said special assessments.

17

ii. DISTRICT shall submit to CITY:

a. A schedule of the proposed special assessments;

b. A schedule of all general obligation costs spent by DISTRICT;

c. A plat of the area to be assessed;

d. A full and detailed statement of the Entire Cost of each type of Public Improvement, which statement or statements shall separately show:

e. The amount paid to the contract;

f. The amount paid to DISTRICT’s Engineer(s) which shall include a complete and itemized log of work hours, testing expenses and all reimbursables that shall be broken down into corresponding service (design, observation, testing, surveying, etc.);

g. The amount paid to DISTRICT’s Attorney(s);

h. The amount paid to DISTRICT’s Fiscal Agent(s), including underwriter(s) for the placement of warrants and DISTRICT’s municipal advisor(s) and other financial services advisor(s) for services during construction; and

i. The amount paid for penalties, forfeitures, or default charges; and

j. A complete and itemized warrant registry detailing the warrant numbers, payee name, registration date, maturity date, interest date, interest rate, the amount paid with corresponding invoice numbers to payee, and the Public Improvement project for which the warrants were issued.

(10) Annual Tax Levy. DISTRICT shall make its annual tax levy in an amount sufficient to timely pay the indebtedness and interest thereof for Public Improvements, but in no event, without prior consent of CITY, which consent may be reasonably withheld at CITY’s sole discretion shall said levy be less than a minimum ad valorem property tax rate of eight y-eight cents (88¢) per one hundred dollars ($100) of taxable valuation for the tax collection years through December 31st of the year that (i) all of DISTRICT’s warrants can be paid on a cash basis and converted to bonded debt and (ii) the debt ratio of DISTRICT as fully bonded is less than or equal to five percent (5%).

(11) Cash Flow Projections. On or about October 1 of each year following the issuance of DISTRICT bonds, DISTRICT shall cause the deliver y of the following information to the City Finance Director for review and approval: a cash flow projection by year for the entire term of the indebtedness. The cash

18

flow projection shall include, but not be limited to, existing and projected taxable valuation, a projected annual debt service levy, existing and projected cash receipts, cash disbursements and available balances in the bond fund and general fund of DISTRICT. DISTRICT shall adopt tax rate levies sufficient to fund the succeeding years’ general and bond fund projected obligation as required in the cash flow projections.

(12) Notice of Annual Budget Meetings. DISTRICT shall provide CITY ten (10) days’ notice of its annual budget meeting along with its tax requests.

(13) Notice and Production of Proposed Budgets. DISTRICT shall furnish to CITY copies of all proposed budgets and published notices of meetings to consider said budget and expenditures at least ten (10) days prior to the Board of Trustee’s meeting to consider and adopt a proposed budget.

(14) Notice of Bankruptcy Filings. DISTRICT warrants that it shall provide CITY with a minimum of thirty (30) days prior written notice of the filing of any petition under Chapter 9 of the United States Bankruptcy Code and DISTRICT shall also provide to CITY actual prior notice of any hearings held in the United States Bankruptcy Court pursuant to any bankruptcy filings.

(15) CITY Approval for Refinancing. The general obligation of DISTRICT shall not be refinanced without DISTRICT first receiving prior approval from CITY for said refinancing. CITY’s approval may be withheld in CITY’s sole discretion.

(16) Reimbursement Delays. Any delay in satisfying a reimbursement obligation, as contemplated herein, shall only be permitted if reasonable under the totality of DISTRICT’s circumstances, as determined by CITY. Any such delay shall not constitute a relief of DISTRICT’s reimbursement responsibility.

(17) ADA Ramp Curb Drops. DISTRICT shall be responsible for providing curb drops for ADA ramps at all Street Intersections as part of the final construction drawings.

(18) As-Built Drawings DISTRICT shall provide as-built drawings on state plane coordinates for all utilities owned and located within the Development Area to CITY. Such as-built drawings shall be provided to CITY as both PDF and AutoCAD files in addition to hard copy.

Section 10 Other Terms and Obligations

A. Boundary of DISTRICT. DISTRICT shall take any action necessary to ensure that the boundary of DISTRICT shall match the boundary of the Final Plat depicted on Exhibit B prior to the execution of this Agreement

B. Building Permits. Building permits shall not be issued for any building until the construction and installation of all requisite Public Improvements to service Shadow

19

Lake 2 is complete, excluding the Gas Distribution System and Electrical Power Service.

C. Covenants. DEVELOPER shall establish and record with the Sarpy County Register of Deeds covenants for the Development Area that: (1) address street creep/driveway binding on curved streets and (2) provide for over lot drainage. DEVELOPER shall provide documentation that the covenants have been recorded against each and every lot within the Development Area prior to the issuance of the first building permit.

D. Discharge Permits in Papillion’s Wastewater Service Area. The City of Omaha is authorized to issue discharge permits in Papillion’s Waste Water Service Area, which includes the Development Area. The Parties acknowledge that the City of Omaha has the authority to enforce prohibitions and limitations as specified in Omaha Municipal Code Chapter 31 by means of discharge permits. All such enforcements shall be in collaboration with and by the written approval of CITY.

E. Easements

(1) Recording. DEVELOPER shall be responsible for recording with the Sarpy County Register of Deeds a separate instrument for each easement contemplated within this Agreement, or otherwise required by CITY.

(2) Copies to CITY. DEVELOPER shall provide copies of all easements to CITY immediately after they are recorded.

(3) Rights and Terms. All easements shall include a prescription outlining the rights and terms of each easement and all corresponding maintenance responsibilities.

(4) To CITY’s Satisfaction. All easements contemplated within this Agreement, or otherwise required by CITY, shall be prepared and filed in a form satisfactory to CITY.

(5) Separate Instruments. DEVELOPER shall dedicate all easements identified in Exhibit B by separate instruments rather than relying upon the Final Plat.

(6) Off-Site Easements for Sewer and Water. Pursuant to Neb. Rev. Stat. § 31-736, CITY hereby grants DISTRICT the requisite approval to acquire by purchase any off-site easements necessary to construct its sanitary sewer system or to connect to CITY’s water system as contemplated by this Agreement (“Off-site Sewer and Water Easements”). Alternatively, CITY acknowledges that DISTRICT may desire to acquire said Off-site Sewer and Water Easements by one of the other methods set out under Neb. Rev. Stat. § 31-736. In such a case, DISTRICT acknowledges that a separate approval from CITY, outside of this Agreement, is required before DISTRICT may exercise any other method of acquisition of real or personal property besides acquisition by purchase.

20

(1) ASIP. All new building permits will be subject to the Arterial Street Improvement Program (ASIP) fee based on the rates established by the Master Fee Schedule in place at the time that the building permit application is made.

(2) Review Fee for Improvements by DISTRICT DISTRICT shall pay a fee of one percent (1%) of the construction cost to CITY to cover engineering, legal, and other miscellaneous expenses incurred by CITY in connection with any necessary review of plans and specifications related to the construction projects performed by DISTRICT. The Review Fee shall be allocated to special assessments and general obligation in the same proportion as the Costs of the particular construction project. CITY shall invoice DISTRICT the Review Fee at the time that each bid is approved for a respective construction project. DISTRICT shall authorize payment of each Review Fee at the next meeting following the date of the review fee invoice issued by CITY.

(3) Review Fee for Improvements by DEVELOPER. DEVELOPER shall pay a fee of one percent (1%) of the construction cost to CITY to cover engineering, legal, and other miscellaneous expenses incurred by CITY in connection with any necessary review of plans and specifications related to the construction projects for Privately Financed Public Improvements performed by DEVELOPER. The Review Fee shall be paid at the sole expense of DEVELOPER. CITY shall invoice DEVELOPER the Review Fee at the time that each review is completed. DEVELOPER shall remit payment to CITY within 30 days of the invoice issuance date.

(4) Sanitary Sewer Connection Fees. All new building permits for structures that require connection to the CITY’s sanitary sewer will be subject to Sewer Connection Fees based on the rates established by the Master Fee Schedule in place at the time that the building permit application is made.

(5) Watershed Fees. All new building permits shall be subject to the Watershed Fee as provided for in the Papillion Master Fee Schedule and as agreed to by the Papillion Creek Watershed Partnership at the time that the building permit application is made. Such fee shall be calculated based on a per lot basis for the lot(s) for which the building permit is requested and shall be due prior to the issuance of the building permit.

(6) Not an Exhaustive List The Parties acknowledge that the forgoing does not constitute an exhaustive list of fees applicable to the development of the Development Area. The relevant fees listed in the Master Fee Schedule shall also apply. The timing of collection of such fees shall depend on the type of fee and the corresponding regulations.

G. Fire Hydrants. DISTRICT shall be responsible for causing all fire hydrants installed for the Development Area to be painted yellow.

21 F. Fees

H. Future Interlocal Cooperation Agreement(s). Upon creation of any Sanitary and Improvement District on an adjoining property, DISTRICT shall enter into any Interlocal Agreement(s) with CITY, such Sanitary and Improvement District(s), and Sarpy County, as applicable, to provide for the reimbursement of expenses related to Public Improvements that benefit DISTRICT; provided, however, such reimbursement may be delayed until such time that DISTRICT’s municipal advisor or other fiscal advisor determines that such reimbursement is fiscally responsible. Any delay of reimbursement shall be reasonable under the totality of DISTRICT’s circumstances and shall not constitute a relief of DISTRICT’s reimbursement responsibility. Further, DISTRICT shall be responsible for payment of any and all accrued interest incurred as a result of the delay.

I. Maintenance of Detention Facilities and Water Quality and Quantity Controls. DEVELOPER, its successors, and assigns shall be responsible for detention facility and Water Quality and Quantity Control construction and maintenance in compliance with the Post Construction Stormwater Management requirements of CITY DISTRICT and CITY shall not have any responsibility for maintenance or repair of any such facility located within the Development Area

J. One Call Services.

(1) CITY shall provide public water main and sanitary sewer line locating services as well as any other utilities that CITY or DISTRICT is responsible for after DISTRICT provides as-built drawings on state plane coordinates for all utilities owned and located within the Development Area. Such as-built drawings shall be provided as an Auto-CAD file in addition to hard copy. DISTRICT shall timely pay to CITY a corresponding fee at the rate established in the Master Fee Schedule for locates that are reasonably required and performed by CITY within the Development Area as received over the One Call System, as invoiced by CITY

(2) CITY shall invoice DISTRICT for the required payment for services on an annual basis and DISTRICT shall have 30 days in which to make payment after receiving each such invoice. CITY shall maintain records of all costs incurred within the Development Area for locating services and DISTRICT shall have the right to audit and review such records at any time to assure that such records are accurate.

K. Right-of-Way Grading. All rights-of-way shall be graded full width with a two percent (2%) grade projecting from the top of curb elevation to the edge of the right-of-way.

L. Traffic Impact Studies DISTRICT shall fully comply with the following:

(1) DISTRICT shall fully finance and cause the completion of a Traffic Impact study to determine whether a traffic signal is Warranted at 72nd Street and Capehart Road and provide said study to CITY as soon as it becomes necessary in order to promote public health, safety, and welfare or immediately upon reasonable request made by the City Administrator or the City Engineer, whichever occurs sooner. This

22

provision shall not be construed to limit the number of studies that may be requested or conducted provided that such requests are reasonable.

(2) DISTRICT shall timely reimburse CITY for the reasonable costs paid by City, if any, for contracting a third-party review of every Traffic Impact Study that is submitted to CITY pursuant to this Agreement. Said third-party review shall be conducted by a third-party reviewer of CITY’s choosing.

M. Traffic Signal at 72nd Street and Capehart Road.

(1) In the event that a traffic signal is deemed Warranted at 72nd Street and Capehart Road, DISTRICT shall be responsible for 100% of the Proportional Cost Share of the traffic signal and intersection improvements related to such traffic signal. DISTRICT shall act as the lead agent for the installation of said signal and any related intersection improvements and shall commence design, bidding, construction, and installation of said improvements as soon as they are Warranted. The obligation to act as lead agent may, alternatively, be assumed by: (1) any Sanitary and Improvement District formed for the development of the property south of Capehart Road that abuts and will be served by the intersection of 72nd Street and Capehart Road, (2) by any private developer(s) of the property south of Capehart Road that abuts and will be served by the intersection of 72nd Street and Capehart Road, or (3) any governmental agency with jurisdiction of the intersection of 72nd Street and Capehart Road.

(2) CITY shall require a proportionate reimbursement to DISTRICT for the cost of the traffic signal at 72nd Street and Capehart Road, as a condition to CITY’s approval for (1) any Sanitary and Improvement District formed for the development of the property south of Capehart Road that abuts and will be served by the intersection of 72nd Street and Capehart Road or (2) by any private developer(s) of the property south of Capehart Road that abuts and will be served by the intersection of 72nd Street and Capehart Road.

(3) In the event that a traffic signal is deemed Warranted at 72nd Street and Capehart Road or upon request of CITY or Sarpy County, DISTRICT shall attempt to enter into an agreement with any other obligated private developers or Sanitary and Improvement Districts, Sarpy County, and any other interested political subdivision, as applicable, to establish DISTRICT’s reimbursement for the traffic signal at 72nd Street and Capehart Road (“Traffic Signal Agreement”). In the event that the Traffic Signal Agreement is not executed or the Traffic Signal Agreement establishes a Proportional Cost Share for DISTRICT that is higher than the percentage contemplated in Exhibit G, then any Costs that exceed DISTRICT’s Proportional Cost share identified in Exhibit G shall be privately financed by DEVELOPER.

N. Tree Mitigation The Parties acknowledge that a portion of the tree line along the northern boundary of the Development is required to be removed to allow for grading of the Development Area and the installation of the sanitary sewer system. In order to

23

mitigate the tree loss, DEVELOPER shall plant twenty (20) trees within the outlots adjacent to the northern boundary.

O. Wastewater Service Agreement Exhibits. DEVELOPER shall be responsible for providing all exhibits required for the amendment to CITY’s Wastewater Sewer Agreement with the City of Omaha as requested by CITY.

Section

11

Outlots in Private Ownership

A. Maintenance of Outlots. DEVELOPER shall be responsible for maintaining any outlot(s) within the Development Area, forming an association to maintain said outlot(s) (the “Shadow Lake 2 Homeowners Association”), or transferring ownership of said outlot(s) to DISTRICT for maintenance. CITY shall not have any responsibility for maintenance of outlots that are not under CITY’s ownership.

B. Prohibition Against Construction and Transfer of Title to Outlots. No building(s) shall be constructed on any outlot(s) within the Development Area. If DEVELOPER retains ownership of any outlot within the Development Area, DEVELOPER agrees that, at least sixty (60) days prior to closing on the sale, donation, or other transfer of said outlot(s) to any entity other than the Shadow Lake 2 Homeowners Association, DEVELOPER shall provide written notice to the transferee of the forgoing restriction which prohibits the construction of any buildings on any outlots within the Development Area. Further, DEVELOPER shall provide CITY with notice of such intended transfer and a copy of the written notice that DEVELOPER provided to the transferee that no buildings can be constructed on said outlot.

C. Property Taxes DEVELOPER agrees to pay all property taxes due for any outlot(s) owned by DEVELOPER, and DISTRICT agrees to pay all property taxes due for any outlot(s) owned by DISTRICT, in a timely manner to prevent said outlot from being offered at the Sarpy County tax sale.

D. Ownership Transfer Prior to Annexation DEVELOPER and DISTRICT agree that ownership of Outlots A through I, inclusive, any future outlots, and all easements rights owned by DEVELOPER or DISTRICT within the Development Area, shall be either maintained by DEVELOPER or transferred to the Shadow Lake 2 Homeowners Association prior to annexation by CITY.

Section 12 Annexation

A. Annexation Notice Any time subsequent to when DISTRICT is put on written notice by CITY that CITY is conducting an investigation to determine the feasibility of annexing said DISTRICT, DISTRICT shall make no further expenditures for any purpose, except for those expenditures previously authorized by a duly approved budget or in the case of a bona fide emergency to prevent injury or damages, without first obtaining permission from CITY, which permission may only be granted by a majority vote of those members elected or appointed to City Council.

24

B. Property Owners Association DEVELOPER shall cause the formation of a homeowners association (“the Shadow Lake 2 Homeowners Association”) prior to the annexation of DISTRICT by CITY, regardless of whether such annexation is a complete annexation or a partial annexation, unless such requirement is waived by the City Administrator.

C. Obligations upon Annexation. Upon annexation of the Development Area and merger of DISTRICT with CITY, the following shall occur:

(1) Within thirty (30) days of the merger of DISTRICT with CITY, DISTRICT shall submit to CITY a written accounting of all assets and liabilities, contingent or fixed, of DISTRICT; provided, however, DISTRICT shall not be required to provide such written accounting in the case of a partial annexation of the Development Area;

(2) Within sixty (60) days of the merger of DISTRICT with CITY, DISTRICT shall provide all books, records, paper, property, and property rights of every kind, as well as contracts, obligations and choses in action of every kind, held by or belonging to DISTRICT to CITY;

(3) Within ninety (90) days, DISTRICT shall require its agents, contractors, and consultants, including, but not limited to, DISTRICT Attorney, DISTRICT Engineer, and DISTRICT underwriter(s), municipal advisor(s), and other financial advisor(s) to provide all records of every kind pertaining to DISTRICT to CITY;

(4) That should CITY annex the entire area of DISTRICT prior to DISTRICT’s levy of special assessments for the Public Improvements, as authorized in Section 4, and thereby succeed to said DISTRICT’s power to levy special assessments, CITY shall levy the same;

(5) CITY shall be liable for and recognize, assume, and carry out all valid contracts and obligations of DISTRICT;

(6) CITY shall provide inhabitants of the Development Area so annexed with substantially the services of other inhabitants of CITY as soon as practicable; and

(7) The laws, ordinances, powers, and government of CITY shall extend over the Development Area so annexed.

D. Partial Annexation. In the event CITY annexes any part of the Development Area, and said annexation does not include the entire territory of DISTRICT, then a division of assets and liabilities of said DISTRICT in connection with such partial annexation of DISTRICT shall be made on the basis of an equitable apportionment of the assets and liabilities of DISTRICT attributable to the area annexed by CITY, and CITY shall not be required to assume in connection with such partial annexation any indebtedness of such DISTRICT which is attributable to the Public Improvements or expenses incurred in connection with areas other than the area so annexed by CITY.

25

Upon completion of a partial annexation of the Development Area, DISTRICT shall provide CITY with all books, records, paper, property and property rights of every kind, contracts, obligations and choses in action of every kind held by or belonging to DISTRICT, which are specifically related to that portion of the Development Area so annexed.

Any partial annexation of the Development Area shall comply with the provisions of Neb. Rev. Stat. § 31-766.

E. No Limitation on CITY’s Annexation Authority. The provisions contained herein shall not be construed as creating any limitations on CITY’s annexation authority, but rather as obligations assumed by DEVELOPER or DISTRICT, as provided, that must be accomplished by the deadlines indicated herein, by law, or by other applicable regulation

Section 13 Miscellaneous Provisions

A. Incorporation of Recitals. The recitals set forth above are, by this reference, incorporated into and deemed part of this Agreement.

B. Termination of Agreement. This Agreement shall not be terminated except by written agreement between DEVELOPER, DISTRICT, and CITY, subject to Section 13(M) in the event a party to this Agreement or subsequent amendments dissolves, or ceases to exist by some other means, without any valid successors or assigns

C. Agreement Binding. The provisions of this Agreement, and all exhibits and documents attached or referenced herein, shall run with the land and shall be binding upon, and shall inure to the benefit of, the Parties, their respective representatives, successors, assigns, heirs, and estates, including all successor owners of the real estate described in the attached Exhibit A. Every time the phrase “successors and assigns”, or similar language, is used throughout this Agreement, it is to be attributed the same meaning as this “Agreement Binding” provision. No special meaning shall be attributed to any instance herein in which the name of a Party is used without the phrase “successors and assigns”, or similar language, following immediately thereafter, unless expressly stated otherwise.

D. Non-Discrimination In the performance of this Agreement, the Parties, their agents, contractors, subcontractors, and consultants shall not discriminate, or permit discrimination, against any person on account of disability, race, color, sex, age, political or religious opinions or affiliations, or national origin in violation of any applicable laws, rules, or regulations of any governmental entity or agency with jurisdiction over any such matter.

E. Governing Law. The Parties to this Agreement shall conform to all existing and applicable CITY ordinances, resolutions, state and federal laws, and all existing and applicable rules and regulations. Any dispute arising from this contractual relationship

26

shall be governed solely and exclusively by Nebraska law except to the extent such provisions may be superseded by applicable federal law, in which case the latter shall apply.

F. Forum Selection and Personal Jurisdiction. Any lawsuit arising from this contractual relationship shall be solely and exclusively filed in, conducted in, and decided by a court of competent jurisdiction located in Nebraska. As such, the Parties also agree to exclusive personal jurisdiction in such court located in Nebraska.

G. Related Contract(s) Voidable. No elected official or any officer or employee of CITY shall have a financial interest, direct or indirect, in any CITY contract related to this Agreement. Any violation of this subsection with the knowledge of the person or corporation contracting with CITY shall render said contract(s) voidable by the Mayor or City Council.

H. No Waiver of Regulations. None of the foregoing provisions shall be construed to imply any waiver of any provision of the zoning or planning requirements or any other section of the Papillion Zoning Code or other Ordinances.

I. No Continuing Waivers. A waiver by any Party of any default, breach, or failure of another shall not be construed as a continuing waiver of the same or of any subsequent or different default, breach, or failure.

J. Indemnity. DEVELOPER and DISTRICT shall defend, indemnify, and hold CITY and its respective employees, agents, and assigns harmless from and against any and all claims, suits, demands, penalties, court costs, attorneys’ fees, other litigation costs, demands, penalties, judgments, actions, losses, damages, or injuries of any nature whatsoever, whether compensatory or punitive, or expenses arising therefrom, either at law or in equity, resulting or arising from or out of or otherwise occurring in relation to any negligence, intentional acts, lack of performance, or subdivision layout and design by DEVELOPER, DISTRICT, or DEVELOPER’s or DISTRICT’s employees, agents, contractors, subcontractors, or other representatives in relation to this Agreement or the financing or development of the Development Area, except to the extent such injury is caused by the gross negligence or intentional acts of CITY. Other litigation costs, as referenced herein, shall include reasonable attorneys’ fees, consultants’ fees, and expert witness fees. Without limiting the generality of the foregoing, such indemnity shall specifically include, but not be limited to:

(1) Any and all claims, suits, demands, penalties, court costs, attorneys’ fees, other litigation costs, demands, penalties, judgments, actions, losses, damages, or injuries of any nature whatsoever to any person or entity which may otherwise arise from, out of, or may be caused by DEVELOPER’s or DISTRICT’s breach, default, or failure to perform or properly perform any of DEVELOPER’s or DISTRICT’s obligations required by any warranty, representation, obligation, or responsibility arising out of state, federal, or local law, or from any provision of this Agreement;

27

(2) Any and all claims, suits, demands, penalties, court costs, attorneys’ fees, other litigation costs, demands, penalties, judgments, actions, losses, damages, or injuries of any nature whatsoever to any person or entity which may otherwise arise from, out of, or may be caused by any unlawful or improper discharge by DEVELOPER, DISTRICT, or DEVELOPER’s or DISTRICT’s respective employees, agents, contractors, subcontractors, and assigns into any Wastewater Sewer System or Storm Sewer during the term of this Agreement;

(3) Any injury, loss, or damage to any person occurring while said individual is on any premises within the Development Area;

(4) Any claims, suits, demands, penalties, court costs, attorneys’ fees, other litigation costs, demands, penalties, judgments, actions, losses, damages, or injuries of any nature whatsoever resulting or arising from or out of or otherwise occurring in relation to any means of acquisition of real or personal property, including right(s)-of-way or easements, by DEVELOPER or DEVELOPER’s respective employees or agents, or by DISTRICT or DISTRICT’s respective employees or agents pursuant to Neb. Rev. Stat. § 31-736 or any other grant of authority.

K. Assignment. Neither this Agreement nor any obligations hereunder shall be assigned without the express written consent of CITY, which may be withheld in CITY’s sole discretion.

L. Entire Agreement. This Agreement and all exhibits and documents attached or referenced herein, which are hereby incorporated and specifically made a part of this Agreement by this reference, express the entire understanding and all agreements of the Parties. Specifically, this Agreement supersedes any prior written or oral agreement or understanding between or among any of the Parties, whether individually or collectively, concerning the subject matter hereof.

M. Modification by Agreement. This Agreement may be modified or amended only by a written agreement executed by all Parties. In the event a party to this Agreement or subsequent amendments dissolves, or ceases to exist by some other means, without any valid successors or assigns, said party shall be considered to be without signing authority; therefore, the signature of said party shall not be required in order to validly execute subsequent modifications or amendments to this Agreement. Any modifications to this Agreement must cause this Agreement and all performance obligations hereunder to conform to the requirements of any applicable laws, rules, regulations, standards, and specifications of any governmental agency with jurisdiction over any such matter, including any amendment or change thereto, without cost to CITY.

N. Notices, Consents, and Approval Unless expressly stated otherwise herein, all payments, notices, statements, demands, requests, consents, approvals, authorizations, or other submissions required to be made by the Parties shall be in writing, whether or not so stated, and shall be deemed sufficient and served upon the other only if sent by

28

United States registered mail, return receipt requested, postage prepaid and addressed as follows:

(1) For DEVELOPER: Shadow Lake 2, LLC

15950 W. Dodge Road, Suite 300

Omaha, NE 68118

Attn: John C. Allen, Manager

(2) For DISTRICT: Sanitary and Improvement District

No. 326 of Sarpy County, Nebraska

c/o PANSING HOGAN ERNST & BACHMAN LLP

10250 Regency Circle, Suite 300

Omaha, NE 68114

Attn: John Q. Bachman

(3) For CITY: City Clerk City of Papillion

122 East Third Street

Papillion, NE 68046

Such addresses may be changed from time to time by written notice to all other Parties.

O. Headings. The section headings appearing in this Agreement are inserted only as a matter of convenience, and in no way define or limit the scope of any section

P. Counterparts. This Agreement may be signed in counterparts, each of which shall be deemed an original and all of which, when taken together, shall constitute one executed instrument.

Q. Severability. In the event that any provision of this Agreement proves to be invalid, void, or illegal by a court of competent jurisdiction, such decision shall in no way affect, impair, or invalidate any other provisions of this Agreement, and such other provisions shall remain in full force and effect as if the invalid, void, or illegal provision was never part of this Agreement.

(Signatures on following pages.)

29

ATTEST: CITY OF PAPILLION, a Nebraska Municipal Corporation

30
CITY SEAL

SANITARY AND IMPROVEMENT DISTRICT

NO. 326 OF SARPY COUNTY, NEBRASKA

STATE OF NEBRASKA ) ) ss.

COUNTY OF SARPY )

Before me, a notary public, in and for said county and state, personally came John C. Allen, Chairman of Sanitary and Improvement District No. 326 of Sarpy County, Nebraska, known to me to be the identical person who executed the above instrument and acknowledged the execution thereof be his voluntary act and deed on behalf of such District.

Witness my hand and Notarial Seal this _____ day of _________________, 2017.

Notary Public

31

Shadow Lake 2, LLC, a Nebraska limited liability company

STATE OF NEBRASKA ) ) ss.

COUNTY OF SARPY )

Before me, a notary public, in and for said county and state, personally came John C. Allen, Manager of Shadow Lake 2, LLC, a Nebraska limited liability company, known to me to be the identical person who executed the above instrument and acknowledged the execution thereof be his voluntary act and deed on behalf of such limited liability company.

Witness my hand and Notarial Seal this _____ day of ________________, 2017.

Notary Public

32
33
INTRODUCTION
SECTIONS: 1 Definitions 2 Public Improvements and Related Terms 3 Standards, Authority, and Documentation 4 Use of DISTRICT Credit or Funds 5 Apportionment of Costs and Related Terms 6 Privately Financed Public Improvements and Related Terms 7 General Obligation Professional Services Fees 8 Covenants by CITY 9 Covenants by DISTRICT 10 Other Obligations 11 Outlots in Private Ownership 12 Annexation 13 Miscellaneous Provisions EXHIBITS: A Legal Description with Metes and Bounds B Final Plat C Paving and Storm Sewer D Sanitary Sewer and Water E Sediment and Erosion Control F Trail and Sidewalks G Source and Use of Funds
SUBDIVISION AGREEMENT TABLE OF CONTENTS
STATEMENT RECITALS
14710WestDodgeRoad,Suite100402.496.2498|P Omaha,Nebraska68154-2027 402.496.2730|F www.LRA-Inc.com LAMPRYNEARSON &ASSOCIATES
14710 West Dodge Road, Suite 100 402.496.2498 | P Omaha, Nebraska 68154-2027 402.496.2730 | F www.L R A-Inc.com LAMP RYNEARSON & ASSOCIATES

Knowwhat'sbelow. beforeyoudig.Call

14710 West Dodge Road, Suite 100 402.496.2498 | P Omaha, Nebraska 68154-2027 402.496.2730 | F www.L R A-Inc.com LAMP RYNEARSON & ASSOCIATES LAMPRYNEARSONENGINEERS

Knowwhat'sbelow. beforeyoudig.Call

SECTION11,T13N,R12E

14710 West Dodge Road, Suite 100 402.496.2498 | P Omaha, Nebraska 68154-2027 402.496.2730 | F www.L R A-Inc.com LAMP RYNEARSON & ASSOCIATES LAMPRYNEARSONENGINEERS

Knowwhat'sbelow. beforeyoudig.Call

14710 West Dodge Road, Suite 100 402.496.2498 | P Omaha, Nebraska 68154-2027 402.496.2730 | F www.L R A-Inc.com LAMP RYNEARSON & ASSOCIATES LAMPRYNEARSONENGINEERS

Knowwhat'sbelow. beforeyoudig.Call

SECTION11,T13N,R12E

14710 West Dodge Road, Suite 100 402.496.2498 | P Omaha, Nebraska 68154-2027 402.496.2730 | F www.L R A-Inc.com LAMP RYNEARSON & ASSOCIATES LAMPRYNEARSONENGINEERS
Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ S.I.D. Cost Estimate Shadow Lake 2 0116080.01-003 SID No.: 326 8/14/2017 8/14/2017 10:35 AMPage 1 of 27ESTIMATE 0116080 Total.xlsx

ORDER OF MAGNITUDE COST ESTIMATE EXHIBIT G

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
ProposedImprovementQuantityUnit Construction Cost TotalCost General Obligation SpecialReimbursable FutureGeneral Obligation SANITARY SEWER Interior10745LF$908,600.00$1,306,600.00$25,500.00$1,281,100.00$0.00$0.00 STORM SEWER Interior4407LF$417,500.00$591,000.00$591,000.00$0.00$0.00$0.00 Culverts195LF$687,800.00$973,600.00$973,600.00$0.00$0.00$0.00 PAVING Minor34700SY$1,551,400.00$2,177,300.00$653,400.00$1,523,900.00$0.00$0.00 PAVING MAJOR - 72ND & CAPEHART14414SY$363,000.00$411,000.00$411,000.00$0.00$0.000 PAVING MAJOR - 72ND & CAPEHART TRAFFIC SIGNAL (FUTURE)1LS$157,500.00$214,100.00$0.00$0.00$158,600.00$55,500.00 SIDEWALKS Interior0SF$0.00$0.00$0.00$0.00$0.00$0.00 Arterial Street Trail (FUTURE)25650SF$130,300.00$183,000.00$0.00$0.00$0.00$183,000.00 SIGNAGE 52EA$45,600.00$67,200.00$67,200.00$0.00$0.00$0.00 WATER Interior11610LF$632,000.00$894,000.00$105,600.00$788,400.00$0.00$0.00 Off-SiteLF$0.00$0.00$0.00$0.00$0.00$0.00 Capital Facilities Charge Residential181Lots$413,600.00$466,200.00$233,100.00$233,100.00$0.00$0.00 Capital Facilities Charge Commons10.03AC$64,000.00$72,200.00$36,100.00$36,100.00$0.00$0.00 POWER 181Lots$244,400.00$326,700.00$0.00$326,700.00$0.00$0.00 PLAN REVIEW FEE 1%$44,500.00$50,100.00$20,200.00$29,900.00$0.00$0.00 Total $5,372,400.00$7,335,900.00$3,116,700.00$4,219,200.00$158,600.00$238,500.00 FutureTotal $5,660,200.00$7,733,000.00$3,355,200.00$4,219,200.00$158,600.00$0.00 181Units=$390,000.00=$70,590,000 Total 95% Valuation=$67,060,500 DEBT RATIO=4.65% DEBT RATIO W/ FUTURE IMPROVEMENTS=5.00% 8/14/201710:35 AMPage 2 of 27ESTIMATE 0116080 Total.xlsx

DEBT RATIO

ASSUMPTIONS

Average market Value Per Residential Land=$50,000.00 (Land Value Only)

Average market Value Per Residential Lot (Home)=$340,000.00 (Improvement value only)

Commercial Land Value per square foot=

Commercial Building Value per square foot=

Apartment Land per square foot=

Apartment Building per square foot=

ASSESSABLE VALUATION

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Residential Land181Units=$50,000.00=$9,050,000.00 Residential Home181Units=$340,000.00=$61,540,000.00 Commercial LandAC=$0.00=$0.00 Commercial BuildingSF=$0.00=$0.00 Apartment LandAC=$0.00=$0.00 Apartment BuildingUnits=$0.00=$0.00 Total 100% Valuation=$70,590,000.00 Total 95% Valuation=$67,060,500.00 DEBT RATIO=4.65% 8/14/201710:35 AMPage 3 of 27ESTIMATE 0116080 Total.xlsx

SANITARY SEWER - INTERIOR

30' OF 6"STUBS, 12' DEEP MANHOLES. CONNECT TO SHADOW LAKE EXISTING STUB AND MH

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. CLEARING AND GRUBBING GENERAL 1 LS$9,417.79$9,417.79 2. REMOVE, SALVAGE, AND REPLACE 18"F.E.S. 2 EA$1,005.36$2,010.72 3. REMOVE, SALVAGE, AND REPLACE 18"STORM SEWER PIPE 32 LF$77.12$2,467.84 4. CONSTRUCT 6"SANITARYSEWER PIPE 5,700 LF$16.96$96,672.00 5. CONSTRUCT 8"SANITARYSEWER PIPE 10,745 LF$17.37$186,640.65 6. CONNECT TO EXISTING MANHOLE 1 EA$919.52$919.52 7. CONSTRUCT 54"I.D. SANITARYMANHOLE (51 EA) 615 VF$386.50$237,697.50 8. CONSTRUCT 8"X6"WYE 140 EA$115.69$16,196.60 9. CONSTRUCT 6"MANHOLE STUBOUT 41 EA$74.98$3,074.18 10. CONSTRUCT 6"SERVICE RISER (18 EA) 124 VF$32.60$4,042.40 11. CONSTRUCT 6"DROP CONNECTION (1 EA) 4 VF$324.65$1,298.60 12. CONSTRUCT 8"DROP CONNECTION (2 EA) 14 VF$332.68$4,657.52 13. CONSTRUCT 6"PIPE BEDDING 5,700 LF$12.53$71,421.00 14. CONSTRUCT 8"PIPE BEDDING 10,745 LF$12.74$136,891.30 15. BORE AND JACK 8"SANITARYSEWER PIPE WITH 16"CASING 30 LF$598.04$17,941.20 16. BORE AND JACK 8"D.I.P. 50 LF$220.79$11,039.50 17. CONSTRUCT COLLAR 4 EA$656.14$2,624.56 18. STABILIZATION TRENCH W/ CRUSHED LIMESTONE 500 TN$36.20$18,100.00 19. EXCAVATION FOR EXTRA DEEP SANITARYSEWER 4,525 VF-LF$5.10$23,077.50 20.CONSTRUCT SILT FENCE 1000LF $3.34$3,340.00 21.CLEANOUT SILT FENCE 1000LF $1.67$1,670.00 22. REMOVE SILT FENCE 1000LF $0.67$670.00 23. CLEANOUT SILT BASIN 1000CY $6.70$6,700.00 24. CONSTRUCT MANHOLE RING COLLAR 9EA $375.00$3,375.00 25. CONSTRUCT EXTERNAL FRAME SEAL 9EA $375.00$3,375.00 CONTINGENCY 5% $865,320.38$43,266.02 Estimated Construction Costs: $908,586.40 Estimated Soft Costs 21.00% $190,803.14 2.00% GeotechnicalandTesting: $18,171.73 5.00% Legal: $45,429.32 5.00% Fiscal: $58,149.53 7.00% Interest: $85,479.81 12 Duration(Months) Total Estimated Soft Costs: 44%$398,033.53 Total Estimated Costs: $1,306,619.93 EngineeringDesignand ConstructionAdministration:
8/14/2017 10:35 AM Page 4 of 27 ESTIMATE 0116080 Total.xlsx

SANITARY SEWER - INTERIOR G.O.

GOsanitary issewer constructed offsiteand erosioncontrol items

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. CLEARING AND GRUBBING GENERAL 0LS $9,417.79$0.00 2. REMOVE, SALVAGE, AND REPLACE 18"F.E.S. 2EA $1,005.36$2,010.72 3. REMOVE, SALVAGE, AND REPLACE 18"STORM SEWER PIPE 32LF $77.12$2,467.84 4. CONSTRUCT 6"SANITARYSEWER PIPE 0LF $16.96$0.00 5. CONSTRUCT 8"SANITARYSEWER PIPE 0LF $17.37$0.00 6. CONNECT TO EXISTING MANHOLE 0EA $919.52$0.00 7. CONSTRUCT 54"I.D. SANITARYMANHOLE (51 EA) 0VF $386.50$0.00 8. CONSTRUCT 8"X6"WYE 0EA $115.69$0.00 9. CONSTRUCT 6"MANHOLE STUBOUT 0EA $74.98$0.00 10. CONSTRUCT 6"SERVICE RISER (18 EA) 0VF $32.60$0.00 11. CONSTRUCT 6"DROP CONNECTION (1 EA) 0VF $324.65$0.00 12. CONSTRUCT 8"DROP CONNECTION (2 EA) 0VF $332.68$0.00 13. CONSTRUCT 6"PIPE BEDDING 0LF $12.53$0.00 14. CONSTRUCT 8"PIPE BEDDING 0LF $12.74$0.00 15. BORE AND JACK 8"SANITARYSEWER PIPE WITH 16"CASING 0LF $598.04$0.00 16. BORE AND JACK 8"D.I.P. 0LF $220.79$0.00 17. CONSTRUCT COLLAR 0EA $656.14$0.00 18. STABILIZATION TRENCH W/ CRUSHED LIMESTONE 0TN $36.20$0.00 19. EXCAVATION FOR EXTRA DEEP SANITARYSEWER 0VF-LF $5.10$0.00 20. CONSTRUCT SILT FENCE 1,000LF $3.34$3,340.00 21. CLEANOUT SILT FENCE 1,000LF $1.67$1,670.00 22. REMOVE SILT FENCE 1,000LF $0.67$670.00 23. CLEANOUT SILT BASIN 1,000CY $6.70$6,700.00 CONTINGENCY 5% $16,858.56$842.93 Estimated Construction Costs: $17,701.49 Estimated Soft Costs 21.00% $3,717.31 2.00% GeotechnicalandTesting: $354.03 5.00% Legal: $885.07 5.00% Fiscal: $1,132.90 7.00% Interest: $1,665.36 12 Duration(Months) Total Estimated Soft Costs: 44%$7,754.67 Total Estimated Costs: $25,456.16 EngineeringDesignand ConstructionAdministration:
8/14/2017 10:35 AM Page 5 of 27 ESTIMATE 0116080 Total.xlsx
Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ STORMSEWERINTERIOR Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.GENERAL GRADING AND SHAPING1LS$8,999.55$8,999.55 2.CONSTRUCT 18" R.C.P., CLASS III1,742LF$31.79$55,378.18 3.CONSTRUCT 18" R.C.P., CLASS IV60LF$36.34$2,180.40 4.CONSTRUCT 24" R.C.P., CLASS III975LF$42.54$41,476.50 5.CONSTRUCT 30" R.C.P., CLASS III1,055LF$65.98$69,608.90 6.CONSTRUCT 36" R.C.P., D(0.01) = 1,350365LF$78.09$28,502.85 7.CONSTRUCT 42" R.C.P., D(0.01) = 1,350210LF$98.00$20,580.00 8.CONSTRUCT 54" I.D. MANHOLE (8 EA)47VF$494.59$23,245.73 9.CONSTRUCT 72" I.D. MANHOLE (1 EA)7VF$860.41$6,022.87 10.CONSTRUCT 54" I.D. TYPE II AREA INLET (3 EA)28VF$461.62$12,925.36 11.CONSTRUCT 18" PIPE BEDDING1,742LF$9.05$15,765.10 12.CONSTRUCT 24" PIPE BEDDING975LF$12.31$12,002.25 13.CONSTRUCT 30" PIPE BEDDING1,055LF$16.44$17,344.20 14.CONSTRUCT 36" PIPE BEDDING525LF$19.69$10,337.25 15.CONSTRUCT 42" PIPE BEDDING210LF$26.44$5,552.40 16.CONSTRUCT 18" R.C. VERTICAL PIPE BEND2EA$738.67$1,477.34 17.CONSTRUCT 24" R.C. VERTICAL PIPE BEND1EA$941.34$941.34 18.CONSTRUCT 30" R.C. VERTICAL PIPE BEND1EA$918.58$918.58 19.CONSTRUCT 36" R.C. VERTICAL PIPE BEND2EA$1,068.32$2,136.64 20.CONSTRUCT 42" R.C. VERTICAL PIPE BEND1EA$1,185.81$1,185.81 21.CONSTRUCT 36" R.C. HORIZONTAL PIPE BEND1EA$1,223.35$1,223.35
18" PIPE PLUG1EA$309.63$309.63
PCC COLLAR2EA$662.16$1,324.32
18" R.C. FLARED END SECTION4EA$1,083.98$4,335.92 25.CONSTRUCT 24" R.C. FLARED END SECTION1EA$1,212.52$1,212.52 26.CONSTRUCT 30" R.C. FLARED END SECTION3EA$1,274.01$3,822.03 27.CONSTRUCT 36" R.C. FLARED END SECTION2EA$1,627.97$3,255.94 28.CONSTRUCT 42" R.C. FLARED END SECTION1EA$1,854.08$1,854.08 29.CONSTRUCT 18" R.C. FLARED END SECTION W/BAR GRATE1EA$1,625.51$1,625.51 30.CONSTRUCT 36" R.C. FLARED END SECTION W/BAR GRATE2EA$2,136.85$4,273.70 31.CONSTRUCT ROCK RIP-RAP - TYPE "B"70TN$57.47$4,022.90 32.ROLLED EROSION CONTROL, TYPE II1,500SY$1.87$2,805.00 33.STABILIZE TRENCH W/ CRUSHED LIMESTONE500TN$37.44$18,720.00 34.CLEANOUT SILT FENCE1,000LF$1.56$1,560.00 35.CONSTRUCT SILT FENCE1,000LF$3.34$3,340.00 36.REMOVE SILT FENCE1,000LF$0.62$620.00 37.CLEANOUT SILT BASIN1,000CY$6.70$6,700.00 CONTINGENCY5%$397,586.15$19,879.31 Estimated Construction Costs: $417,465.46 Estimated Soft Costs 19.00% $79,318.44 2.00% GeotechnicalandTesting: $8,349.31 5.00% Legal: $20,873.27 5.00% Fiscal: $26,300.32 7.00% Interest: $38,661.48 12 Duration(Months) Total Estimated Soft Costs: 42%$173,502.82 Total Estimated Costs: $590,968.28 EngineeringDesignand ConstructionAdministration: 8/14/201710:35 AMPage 6 of27ESTIMATE 0116080 Total.xlsx
22CONSTRUCT
23CONSTRUCT
24.CONSTRUCT
Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.REMOVE TEMPORARY CMP CULVERTS294LF$23.60$6,938.40 2.COMMON EARTH EXCAVATION - CULVERT3,000CY$9.80$29,400.00 3.STRIP, STOCKPILE, AND RESPREAD WETLAND SOIL200CY$13.70$2,740.00 4.CONSTRUCT DITCH DIVERSION50LF$23.60$1,180.00 5.CONSTRUCT STEEL SHEETING WALLS720SF$17.60$12,672.00 6.CONSTRUCT HEADWALLS (DOUBLE 54" RCP CULVERT)2EA$7,148.10$14,296.20 7.FURNISH AND INSTALL ROUGHNESS BARS FOR BOX CULVERT12EA$1,356.20$16,274.40 8.STABILIZE TRENCH W/ CRUSHED LIMESTONE250TN$25.60$6,400.00 9.CONSTRUCT 54" R.C.P., D(0.01) = 1,350130LF$294.50$38,285.00 10.CONSTRUCT 54" PIPE BEDDING130LF$20.10$2,613.00 11.CONSTRUCT DOUBLE 7' X 6' BOX CULVERT WITH HEADWALLS65LF$1,299.90$84,493.50 12.CONSTRUCT 18" R.C.P., CLASS III100LF$48.70$4,870.00 13.CONSTRUCT 18" PIPE BEDDING100LF$9.30$930.00 14.TAP 18" RCP INTO BOX CULVERT1EA$768.80$768.80 15.TAP 18" RCP INTO 54" RCP1EA$1,341.30$1,341.30 16. CONSTRUCT SEGMENTAL BLOCK RETAINING WALL - LARGE BLOCK (DOUBLE 54" RCP CULVERT)4,284SF$65.30$279,745.20 17. CONSTRUCT SEGMENTAL BLOCK RETAINING WALL - LARGE BLOCK (DOUBLE 7' X 6' BOX CULVERT)2,110SF$50.10$105,711.00 18.CONSTRUCT ROCK RIP-RAP - TYPE "C"50TN$81.80$4,090.00 19.SEEDING - TYPE "WETLANDS"1AC$5,295.00$5,295.00 20.ROLLED EROSION CONTROL, TYPE II800SY$1.60$1,280.00 21.CONSTRUCT SILT FENCE800LF$4.20$3,360.00 22.ANTI-GRAFFITI COATING FOR SEGMENTAL BLOCK RETAINING WALL6,394SF$4.00$25,576.00 23.BX 1100 GEOGRID100SY$9.80$980.00 24.CONSTRUCT FENCE35LF$108.00$3,780.00 25.CONSTRUCT STEEL CASING75LF$75.80$5,685.00 26.CONSTRUCT UTILITY CONDUITS24LF$42.70$1,024.80 CONTINGENCY4%$659,729.60$28,038.51 Estimated Construction Costs: $687,768.11 Estimated Soft Costs 19.00% $130,675.94 2.00% GeotechnicalandTesting: $13,755.36 5.00% Legal: $34,388.41 5.00% Fiscal: $43,329.39 7.00% Interest: $63,694.20 12 Duration(Months) Total Estimated Soft Costs: 42%$285,843.30 Total Estimated Costs: $973,611.41 EngineeringDesignand 8/14/201710:35 AMPage 7 of27ESTIMATE 0116080 Total.xlsx
STORMSEWER-CULVERTS
ShadowLake 2 0116080.01-003 L:\Engineering\0116080 ShadowLake 2\DESIGN DATA\ STORM
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. GENERAL GRADING AND SHAPING 1 LS $8,999.55$8,999.55 2. CONSTRUCT 18" R.C.P., CLASS III 1,742 LF $31.79$55,378.18 3. CONSTRUCT 18" R.C.P., CLASS IV 60 LF $36.34$2,180.40 4. CONSTRUCT 24" R.C.P., CLASS III 975 LF $42.54$41,476.50 5. CONSTRUCT 30" R.C.P., CLASS III 1,055 LF $65.98$69,608.90 6. CONSTRUCT 36" R.C.P., D(0.01) = 1,350 365 LF $78.09$28,502.85 7. CONSTRUCT 42" R.C.P., D(0.01) = 1,350 210 LF $98.00$20,580.00 8. CONSTRUCT 54" I.D. MANHOLE (8 EA) 47 VF $494.59$23,245.73 9. CONSTRUCT 72" I.D. MANHOLE (1 EA) 7 VF $860.41$6,022.87 10. CONSTRUCT 54" I.D. TYPE II AREA INLET (3 EA) 28 VF $461.62$12,925.36 11. CONSTRUCT 18" PIPE BEDDING 1,742 LF $9.05$15,765.10 12. CONSTRUCT 24" PIPE BEDDING 975 LF $12.31$12,002.25 13. CONSTRUCT 30" PIPE BEDDING 1,055 LF $16.44$17,344.20 14. CONSTRUCT 36" PIPE BEDDING 525 LF $19.69$10,337.25 15. CONSTRUCT 42" PIPE BEDDING 210 LF $26.44$5,552.40 16. CONSTRUCT 18" R.C. VERTICAL PIPE BEND 2 EA $738.67$1,477.34 17. CONSTRUCT 24" R.C. VERTICAL PIPE BEND 1 EA $941.34$941.34 18. CONSTRUCT 30" R.C. VERTICAL PIPE BEND 1 EA $918.58$918.58 19. CONSTRUCT 36" R.C. VERTICAL PIPE BEND 2 EA $1,068.32$2,136.64 20. CONSTRUCT 42" R.C. VERTICAL PIPE BEND 1 EA $1,185.81$1,185.81 21. CONSTRUCT 36" R.C. HORIZONTAL PIPE BEND 1 EA $1,223.35$1,223.35 22. CONSTRUCT 18" PIPE PLUG 1 EA $309.63$309.63 23. CONSTRUCT PCC COLLAR 2 EA $662.16$1,324.32 24. CONSTRUCT 18" R.C. FLARED END SECTION 4 EA $1,083.98$4,335.92 25. CONSTRUCT 24" R.C. FLARED END SECTION 1 EA $1,212.52$1,212.52 26. CONSTRUCT 30" R.C. FLARED END SECTION 3 EA $1,274.01$3,822.03 27. CONSTRUCT 36" R.C. FLARED END SECTION 2 EA $1,627.97$3,255.94 28. CONSTRUCT 42" R.C. FLARED END SECTION 1 EA $1,854.08$1,854.08 29. CONSTRUCT 18" R.C. FLARED END SECTION W/BAR GRATE 1 EA $1,625.51$1,625.51 30. CONSTRUCT 36" R.C. FLARED END SECTION W/BAR GRATE 2 EA $2,136.85$4,273.70 31. CONSTRUCT ROCK RIP-RAP - TYPE "B" 70 TN $57.47$4,022.90 32. ROLLED EROSION CONTROL, TYPE II 1,500 SY $1.87$2,805.00 33. STABILIZE TRENCH W/ CRUSHED LIMESTONE 500 TN $37.44$18,720.00 34. CLEANOUT SILT FENCE 1,000 LF $1.56$1,560.00 35. CONSTRUCT SILT FENCE 1,000 LF $3.34$3,340.00 36. REMOVE SILT FENCE 1,000 LF $0.62$620.00 37. CLEANOUT SILT BASIN 1,000 CY $6.70$6,700.00 CONTINGENCY 5% $397,586.15$19,879.31 Estimated Construction Costs: $417,465.46 Estimated Soft Costs 19.00% $79,318.44 2.00% GeotechnicalandTesting: $8,349.31 5.00% Legal: $20,873.27 5.00% Fiscal: $26,300.32 7.00% Interest: $38,661.48 12 Duration(Months) Total Estimated Soft Costs: 42%$173,502.82 Total Estimated Costs: $590,968.28 EngineeringDesignand ConstructionAdministration:
8/14/2017 10:35 AM Page 8 of 27 ESTIMATE 0116080 Total.xlsx
SEWER G.O.
STORMSEWERGREATERTHAN48" SHALL BEBESPECIAL. ASSUME>48" STORMSEWER= $120/LF

STORM SEWER - CULVERTS G.O.

ShadowLake 2 0116080.01-003 L:\Engineering\0116080 ShadowLake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal CULVERTS 1. REMOVE TEMPORARY CMP CULVERTS 294 LF$23.60$6,938.40 2. COMMON EARTH EXCAVATION - CULVERT 3,000 CY$9.80$29,400.00 3. STRIP, STOCKPILE, AND RESPREAD WETLAND SOIL 200 CY$13.70$2,740.00 4. CONSTRUCT DITCH DIVERSION 50 LF$23.60$1,180.00 5. CONSTRUCT STEEL SHEETING WALLS 720 SF$17.60$12,672.00 6. CONSTRUCT HEADWALLS (DOUBLE 54" RCP CULVERT) 2 EA$7,148.10$14,296.20 7. FURNISH AND INSTALL ROUGHNESS BARS FOR BOXCULVERT 12 EA$1,356.20$16,274.40 8. STABILIZE TRENCH W/ CRUSHED LIMESTONE 250 TN$25.60$6,400.00 9. CONSTRUCT 54" R.C.P., D(0.01) = 1,350 130 LF$294.50$38,285.00 10. CONSTRUCT 54" PIPE BEDDING 130 LF$20.10$2,613.00 11. CONSTRUCT DOUBLE 7' X6' BOXCULVERT WITH HEADWALLS 65 LF$1,299.90$84,493.50 12. CONSTRUCT 18" R.C.P., CLASS III 100 LF$48.70$4,870.00 13. CONSTRUCT 18" PIPE BEDDING 100 LF$9.30$930.00 14. TAP 18" RCP INTO BOXCULVERT 1 EA$768.80$768.80 15. TAP 18" RCP INTO 54" RCP 1 EA$1,341.30$1,341.30 16. CONSTRUCT SEGMENTAL BLOCK RETAINING WALL - LARGE BLOCK (DOUBLE 54" RCP CULVERT) 4,284 SF$65.30$279,745.20 17. CONSTRUCT SEGMENTAL BLOCK RETAINING WALL - LARGE BLOCK (DOUBLE 7' X6' BOXCULVERT) 2,110 SF$50.10$105,711.00 18. CONSTRUCT ROCK RIP-RAP - TYPE "C" 50 TN$81.80$4,090.00 19. SEEDING - TYPE "WETLANDS" 1 AC$5,295.00$5,295.00 20. ROLLED EROSION CONTROL, TYPE II 800 SY$1.60$1,280.00 21.CONSTRUCT SILT FENCE 800 LF$4.20$3,360.00 22. ANTI-GRAFFITI COATING FOR SEGMENTAL BLOCK RETAINING WALL 6,394 SF$4.00$25,576.00 23. BX1100 GEOGRID 100 SY $9.80 $980.00 24. CONSTRUCT FENCE 35 LF$108.00$3,780.00 25. CONSTRUCT STEEL CASING 75 LF$75.80$5,685.00 26. CONSTRUCT UTILITY CONDUIT 24 LF$42.70$1,024.80 CONTINGENCY 4% $659,729.60$28,038.51 0 Estimated Construction Costs: $687,768.11 Estimated Soft Costs 19.00% $130,675.94 2.00% GeotechnicalandTesting: $13,755.36 5.00% Legal: $34,388.41 5.00% Fiscal: $43,329.39 7.00% Interest: $63,694.20 12 Duration(Months) Total Estimated Soft Costs: 42%$285,843.30 Total Estimated Costs: $973,611.41 EngineeringDesignand 8/14/2017 10:35 AM Page 9 of 27 ESTIMATE 0116080 Total.xlsx

PAVING MINOR

Grading tie-infor 75th Street connection. Willneed easement

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.REMOVE CONCRETE HEADER 50LF$10.00$500.00 2.REMOVE BARRICADE 1EA$350.00$350.00 3.SAWCUT PAVEMENT 50LF$5.00$250.00 4.REMOVE PAVEMENT 80SY$12.00$960.00 5.REMOVE SIDEWALK 225SF$2.00$450.00 6. REMOVE AND REPLACE FENCE AND LANDSCAPING 1 LS$5,000.00$5,000.00 7. 7"CONCRETE PAVEMENT - TYPE L65 34,700 SY$33.00$1,145,100.00 8. COMMON EARTH EXCAVATION 11,567 CY$3.50$40,483.33 9. CONSTRUCT 5"CONCRETE SIDEWALK 6,984 SF$4.00$27,936.00 10. CONSTRUCT CURB INLET 33 EA$3,000.00$99,000.00 11. ADJUST MANHOLE TO GRADE (41 SANITARY, 9 STORM) 50 EA$200.00$10,000.00 12. CONSTRUCT EXTERNAL FRAME SEAL 50 EA$375.00$18,750.00 13. CONSTRUCT CONCRETE HEADER 50 LF$5.00$250.00 14. CONSTRUCT BURIED LUG HEADER 4 EA$500.00$2,000.00 15. CONSTRUCT BARRICADE 2 EA$750.00$1,500.00 16. REBAR FOR REINFORCED PAVEMENT 1 LS$3,000.00$3,000.00 17. DRILL AND EPOXY#5 X18"TIE BARS AT 2'-9"CENTERS 70 EA$10.00$700.00 18. SEEDING - TYPE "TEMPORARYSEED MIX" 14 AC$600.00$8,400.00 19. STRAW MULCH 14 AC$600.00$8,400.00 20. CONSTRUCT SILT FENCE 1,000 LF$3.00$3,000.00 21. CLEANOUT SILT FENCE 1,000 LF$1.00$1,000.00 22. CLEANOUT SILT BASIN 1,000 CY$5.00$5,000.00 23. JET EXISTING SEWER 10,745 LF$1.00$10,745.00 24. ROLLED EROSION CONTROL, TYPE II 1,000 SY$3.00$3,000.00 25. REIMBURSEMENT FOR EXISTING STORM SEWER 1 LS$81,708.00$81,708.00 26. CONTRACTOR FEE FOR REIMBURSEMENT COORDINATION 1 LS$4,090.00$4,090.00 CONTINGENCY 5% $1,395,774.33$69,788.72 Estimated Construction Costs: $1,551,361.05 Estimated Soft Costs 20.00% $310,272.21 2.00% GeotechnicalandTesting: $31,027.22 5.00% Legal: $77,568.05 5.00% Fiscal: $98,511.43 7.00% Interest: $108,608.85 9 Duration(Months) Total Estimated Soft Costs: 40%$625,987.76 Total Estimated Costs: $2,177,348.81 EngineeringDesignand ConstructionAdministration:
Assumptions/Comments:
8/14/2017 10:35 AM Page 10 of 27 ESTIMATE 0116080 Total.xlsx

PAVING MINOR G.O.

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. REMOVE CONCRETE HEADER 50LF $10.00$500.00 2. REMOVE BARRICADE 1EA $350.00$350.00 3. SAWCUT PAVEMENT 50LF $5.00$250.00 4. REMOVE PAVEMENT 80SY $12.00$960.00 5. REMOVE SIDEWALK 225SF $2.00$450.00 6. REMOVE AND REPLACE FENCE AND LANDSCAPING 1LS $5,000.00$5,000.00 7. 7"CONCRETE PAVEMENT - TYPE L65 4,628SY $33.00$152,724.00 8. COMMON EARTH EXCAVATION 1,543CY $3.50$5,399.33 9. CONSTRUCT 5"CONCRETE SIDEWALK 6,984SF $4.00$27,936.00 10. CONSTRUCT CURB INLET 33EA $3,000.00$99,000.00 11. ADJUST MANHOLE TO GRADE (9 SANITARY, 4 STORM) 13EA $200.00$10,000.00 12. CONSTRUCT EXTERNAL FRAME SEAL 13EA $375.00$18,750.00 13. CONSTRUCT CONCRETE HEADER 50LF $5.00$250.00 14. CONSTRUCT BURIED LUG HEADER 4EA $500.00$2,000.00 15. CONSTRUCT BARRICADE 2EA $750.00$1,500.00 16. REBAR FOR REINFORCED PAVEMENT 1LS $3,000.00$3,000.00 17. DRILL AND EPOXY#5 X18"TIE BARS AT 2'-9"CENTERS 70EA $10.00$700.00 18. SEEDING - TYPE "TEMPORARYSEED MIX" 14AC $600.00$8,400.00 19. STRAW MULCH 14AC $600.00$8,400.00 20. CONSTRUCT SILT FENCE 1,000LF $3.00$3,000.00 21. CLEANOUT SILT FENCE 1,000LF $1.00$1,000.00 22. CLEANOUT SILT BASIN 1,000CY $5.00$5,000.00 23. JET EXISTING SEWER 0LF $1.00$0.00 24. ROLLED EROSION CONTROL, TYPE II 1,000SY $3.00$3,000.00 25. REIMBURSEMENT FOR EXISTING STORM SEWER 1LS $81,708.00$81,708.00 26. CONTRACTOR FEE FOR REIMBURSEMENT COORDINATION 1LS $4,090.00$4,090.00 CONTINGENCY 5% $443,367.33$22,168.37 Estimated Construction Costs: $465,535.70 Estimated Soft Costs 20.00% $93,107.14 2.00% GeotechnicalandTesting: $9,310.71 5.00% Legal: $23,276.79 5.00% Fiscal: $29,561.52 7.00% Interest: $32,591.57 9 Duration(Months) Total Estimated Soft Costs: 40%$187,847.73 Total Estimated Costs: $653,383.43 EngineeringDesignand ConstructionAdministration:
Assumptions/Comments:
8/14/2017 10:35 AM Page 11 of 27 ESTIMATE 0116080 Total.xlsx
GO pavement isintersection paving, paving adjacent to outlots and widerthan 25', aswellas paving offsite to connect to existing pavement

PAVING MAJOR - 72ND & CAPEHART

Per Sarpy County, ShadowLake 2 shall contibute 33% of construction, engineering and CA of improvement project adjacent to development. Improvements are those on 72nd Street and Capehart Road adjacent to the development only.

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. CLEARING AND GRUBBING GENERAL 1LS $15,685.00$15,685.00 2 GRUBBING STUMPS OVER 12"TO 24"DIAMETER 1EA $50.00$50.00 3 GRUBBING STUMPS OVER 24"TO 36"DIAMETER 0EA $80.00$0.00 4 GRUBBING STUMPS OVER 36"DIAMETER 0EA $170.00$0.00 5 REMOVE 18"OR SMALLER CULVERT PIPE 86LF $10.00$860.00 6 REMOVE CULVERT PIPE OVER 18"TO 24" 20LF $10.00$200.00 7 REMOVE CULVERT PIPE OVER 24"TO 30" 107LF $13.00$1,391.00 8 REMOVE 36"CULVERT PIPE 77LF $13.00$1,001.00 9 REMOVE 48"CULVERT PIPE 75LF $13.00$975.00 10 REMOVE MANHOLE 0EA $800.00$0.00 11 REMOVE FLARED END SECTION (LESS THAN 24") 0EA $160.00$0.00 12 REMOVE FLARED END SECTION OVER 36"TO 48" 0EA $160.00$0.00 13 REMOVE AND REPLACE MAILBOX 1EA $60.00$60.00 14 REMOVE GUARD POST 1EA $50.00$50.00 15 REMOVE FENCE 820LF $2.00$1,640.00 16 REMOVE ROCK RETAINING WALL 0LS $150.00$0.00 17 REMOVE HEADWALL 0EA $50.00$0.00 18 REMOVE BUILDING 1LS $700.00$700.00 19 REMOVE CONCRETE HEADER 36LF $3.00$108.00 20 SAW CUT - FULL DEPTH 10LF $7.00$70.00 21 REMOVE PAVEMENT 29SY $13.00$377.00 22 EARTHWORK (EXCAVATION) 29047CY $5.10$148,139.70 23 EARTHWORK (OFF-SITE BORROW) 0CY $12.00$0.00 24 EARTHWORK (UNSUITABLE EXCAVATION) 0CY $5.10$0.00 25 EXPLORATORYEXCAVATION 0HR $50.00$0.00 26 9"CONCRETE PAVEMENT - TYPE L65 14228SY $32.50$462,410.00 27 7"CONCRETE DRIVEWAY- TYPE L65 186SY $37.50$6,975.00 28 CONSTRUCT CRUSHED ROCK SURFACING (4"THICK) 79TN $30.00$2,370.00 29 CONSTRUCT AND REMOVE TEMPORARYROCK ACCESS ROAD (4"THICK) 0TN $14.00$0.00 30 CONSTRUCT THICKENED EDGE PAVEMENT 0LF $7.00$0.00 31 CONSTRUCT CONCRETE HEADER 0LF $8.00$0.00 32 DRILL AND EPOXY1"X18"DOWEL BARS AT 12"CENTERS 36EA $12.00$432.00 33 CONSTRUCT P.C. CONCRETE FLUME 2EA $1,200.00$2,400.00 34 CONSTRUCT 3-STRAND BARBED WIRE FENCE 729LF $2.15$1,567.35 35 CONSTRUCT 4-STRAND BARBED WIRE FENCE 0LF $2.90$0.00 36 CONSTRUCT 4'CHAIN LINK FENCE 0LF $16.00$0.00 37 CONSTRUCT GATE 0EA $600.00$0.00 38 CONSTRUCT DOUBLE SWING GATE 0EA $900.00$0.00 39 PULL POST 2EA $150.00$300.00 40 END POST 2EA $160.00$320.00 41 CORNER POST 0EA $215.00$0.00 42 CONSTRUCT 18"R.C.P., CLASS IV 297LF $37.00$10,989.00 43 CONSTRUCT 30"R.C.P., CLASS III 0LF $60.00$0.00 44 CONSTRUCT 36"R.C.P., D(0.01) = 1,350 52LF $80.00$4,160.00 45 CONSTRUCT 42"R.C.P., D(0.01) = 1,350 202LF $112.00$22,624.00 46 CONSTRUCT 54"R.C.P., D(0.01) = 1,350 219LF $155.00$33,945.00 47 CONSTRUCT 60"R.C.P., D(0.01) = 1,350 0LF $190.00$0.00 48 CONSTRUCT 18"PIPE BEDDING 297LF $6.00$1,782.00 49 CONSTRUCT 30"PIPE BEDDING 0LF $7.00$0.00 50 CONSTRUCT 36"PIPE BEDDING 52LF $6.00$312.00 51 CONSTRUCT 42"PIPE BEDDING 202LF $7.75$1,565.50 52 CONSTRUCT 54"PIPE BEDDING 219LF $14.00$3,066.00 53 CONSTRUCT 60"PIPE BEDDING 0LF $15.25$0.00 54 CONSTRUCT 18"R.C. FLARED END SECTION 6EA $1,200.00$7,200.00 55 CONSTRUCT 30"R.C. FLARED END SECTION 0EA $1,500.00$0.00 56 CONSTRUCT 36"R.C. FLARED END SECTION 2EA $2,000.00$4,000.00 57 CONSTRUCT 42"R.C. FLARED END SECTION 4EA $2,300.00$9,200.00 58 CONSTRUCT 54"R.C. FLARED END SECTION 4EA $3,000.00$12,000.00 59 CONSTRUCT 60"R.C. FLARED END SECTION 0EA $3,500.00$0.00 60 CONSTRUCT 60"AREA INLET - TYPE II 0EA $4,500.00$0.00 61 CONSTRUCT 54"I.D. FLATTOP MANHOLE 0EA $3,500.00$0.00 62 CONSTRUCT 96"I.D. FLATTOP MANHOLE 0EA $11,000.00$0.00 63 CONSTRUCT 18"R.C. VERTICAL PIPE BEND 0EA $875.00$0.00 64 CONSTRUCT 54"R.C. VERTICAL PIPE BEND 2EA $2,100.00$4,200.00
8/14/2017 10:35 AM Page 12 of 27 ESTIMATE 0116080 Total.xlsx
Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ 65 STABILIZE TRENCH WITH CRUSHED LIMESTONE 0TN $28.00$0.00 66 CONSTRUCT ROCK RIP-RAP - TYPE "A" 189TN $51.00$9,639.00 67 CONSTRUCT ROCK RIP-RAP - TYPE "B" 0TN $51.00$0.00 68 CONSTRUCT ROCK RIP-RAP - TYPE "C" 300TN $51.00$15,300.00 69 SEEDING - TYPE "B" 9AC $670.00$6,030.00 70 CONSTRUCT SILT FENCE 412LF $2.00$824.00 71 CONSTRUCT STRAW WATTLE SILT CHECK 624LF $2.65$1,653.60 72 CONSTRUCT FLARED END INLET PROTECTION 8EA $113.00$904.00 73 ROLLED EROSION CONTROL, TYPE II 42471SY $0.95$40,347.45 74 PERMANENT PAINTED PAVEMENT MARKING - 5"WHITE SOLID 7448LF $0.32$2,383.36 75 PERMANENT PAINTED PAVEMENT MARKING - 5"YELLOW SOLID 7376LF $0.38$2,802.88 76 PERMANENT PAINTED PAVEMENT MARKING - 5"YELLOW SKIP (BROKEN) 1609LF $0.38$611.42 77 PERMANENT PAINTED PAVEMENT MARKING - 10"WHITE SOLID 0LF $0.75$0.00 78 PREFORMED PAVEMENT MARKING TAPE MARKING SYMBOL - WHITE DIRECTIONAL ARROW 4EA $300.00$1,200.00 79 PREFORMED PAVEMENT MARKING TAPE MARKING SYMBOL - WHITE "ONLY" 2EA $245.00$490.00 80 3"CONDUIT (PVC OR HDPE) 229LF $14.50$3,320.50 81 PULL BOX, TYPE PB-6 2EA $700.00$1,400.00 82 BARRICADING 1LS $7,012.00$7,012.00 CONTINGENCY 5%$857,042.76$42,852.14 Estimated Construction Costs: $899,894.90 Estimated Soft Costs 19.00% $170,980.03 2.00% GeotechnicalandTesting: $17,997.90 Total Estimated Costs (Sarpy County): $1,088,872.83 1/3 Total Reimbursable to Sarpy County: $362,957.61 2.00% Engineering: $7,259.15 2.00% Legal: $7,259.15 5.00% Fiscal: $18,873.80 7.00% Interest: $20,808.36 9 Duration(Months) Total Estimated Soft Costs: 13%$46,941.31 Total Estimated Costs: $409,898.92 EngineeringDesignand ConstructionAdministration: 8/14/2017 10:35 AM Page 13 of 27 ESTIMATE 0116080 Total.xlsx

PAVING MAJOR - 72ND & CAPEHART TRAFFIC SIGNAL (FUTURE)

Assumptions/Comments:

Assume a future traffic signal with 2 future contributionsby SW & SE corners and 25% contribution from the county. Scope is not known at this time.

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. 72ND & CAPEHART TRAFFIC SIGNAL 1LS $150,000.00$150,000.00 CONTINGENCY 5%$150,000.00$7,500.00 Estimated Construction Costs: $157,500.00 Estimated Soft Costs 19.00% $29,925.00 2.00% Engineering: $3,150.00 2.00% Legal: $3,150.00 5.00% Fiscal: $9,686.25 7.00% Interest: $10,679.09 9 Duration(Months) Total Estimated Soft Costs: 36%$56,590.34 Total Estimated Future Costs: $214,090.34 Total Estimated Sarpy County Reimbursable $47,643.75 Total Estimated Adjacent Property Reimbursables: $110,964.39 Total Estimated SID Costs (Future): $55,482.20 Total Estimated SID Costs (Now): $0.00 EngineeringDesignand
8/14/2017 10:35 AM Page 14 of 27 ESTIMATE 0116080 Total.xlsx

PAVING MAJOR G.O.

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. CLEARING AND GRUBBING GENERAL 1LS $15,685.00$15,685.00 2 GRUBBING STUMPS OVER 12"TO 24"DIAMETER 1EA $50.00$50.00 3 GRUBBING STUMPS OVER 24"TO 36"DIAMETER 0EA $80.00$0.00 4 GRUBBING STUMPS OVER 36"DIAMETER 0EA $170.00$0.00 5 REMOVE 18"OR SMALLER CULVERT PIPE 86LF $10.00$860.00 6 REMOVE CULVERT PIPE OVER 18"TO 24" 20LF $10.00$200.00 7 REMOVE CULVERT PIPE OVER 24"TO 30" 107LF $13.00$1,391.00 8 REMOVE 36"CULVERT PIPE 77LF $13.00$1,001.00 9 REMOVE 48"CULVERT PIPE 75LF $13.00$975.00 10 REMOVE MANHOLE 0EA $800.00$0.00 11 REMOVE FLARED END SECTION (LESS THAN 24") 0EA $160.00$0.00 12 REMOVE FLARED END SECTION OVER 36"TO 48" 0EA $160.00$0.00 13 REMOVE AND REPLACE MAILBOX 1EA $60.00$60.00 14 REMOVE GUARD POST 1EA $50.00$50.00 15 REMOVE FENCE 820LF $2.00$1,640.00 16 REMOVE ROCK RETAINING WALL 0LS $150.00$0.00 17 REMOVE HEADWALL 0EA $50.00$0.00 18 REMOVE BUILDING 1LS $700.00$700.00 19 REMOVE CONCRETE HEADER 36LF $3.00$108.00 20 SAW CUT - FULL DEPTH 10LF $7.00$70.00 21 REMOVE PAVEMENT 29SY $13.00$377.00 22 EARTHWORK (EXCAVATION) 29047CY $5.10$148,139.70 23 EARTHWORK (OFF-SITE BORROW) 0CY $12.00$0.00 24 EARTHWORK (UNSUITABLE EXCAVATION) 0CY $5.10$0.00 25 EXPLORATORYEXCAVATION 0HR $50.00$0.00 26 9"CONCRETE PAVEMENT - TYPE L65 14228SY $32.50$462,410.00 27 7"CONCRETE DRIVEWAY- TYPE L65 186SY $37.50$6,975.00 28 CONSTRUCT CRUSHED ROCK SURFACING (4"THICK) 79TN $30.00$2,370.00 29 CONSTRUCT AND REMOVE TEMPORARYROCK ACCESS ROAD (4"THICK) 0TN $14.00$0.00 30 CONSTRUCT THICKENED EDGE PAVEMENT 0LF $7.00$0.00 31 CONSTRUCT CONCRETE HEADER 0LF $8.00$0.00 32 DRILL AND EPOXY1"X18"DOWEL BARS AT 12"CENTERS 36EA $12.00$432.00 33 CONSTRUCT P.C. CONCRETE FLUME 2EA $1,200.00$2,400.00 34 CONSTRUCT 3-STRAND BARBED WIRE FENCE 729LF $2.15$1,567.35 35 CONSTRUCT 4-STRAND BARBED WIRE FENCE 0LF $2.90$0.00 36 CONSTRUCT 4'CHAIN LINK FENCE 0LF $16.00$0.00 37 CONSTRUCT GATE 0EA $600.00$0.00 38 CONSTRUCT DOUBLE SWING GATE 0EA $900.00$0.00 39 PULL POST 2EA $150.00$300.00 40 END POST 2EA $160.00$320.00 41 CORNER POST 0EA $215.00$0.00 42 CONSTRUCT 18"R.C.P., CLASS IV 297LF $37.00$10,989.00 43 CONSTRUCT 30"R.C.P., CLASS III 0LF $60.00$0.00 44 CONSTRUCT 36"R.C.P., D(0.01) = 1,350 52LF $80.00$4,160.00 45 CONSTRUCT 42"R.C.P., D(0.01) = 1,350 202LF $112.00$22,624.00 46 CONSTRUCT 54"R.C.P., D(0.01) = 1,350 219LF $155.00$33,945.00 47 CONSTRUCT 60"R.C.P., D(0.01) = 1,350 0LF $190.00$0.00 48 CONSTRUCT 18"PIPE BEDDING 297LF $6.00$1,782.00 49 CONSTRUCT 30"PIPE BEDDING 0LF $7.00$0.00 50 CONSTRUCT 36"PIPE BEDDING 52LF $6.00$312.00 51 CONSTRUCT 42"PIPE BEDDING 202LF $7.75$1,565.50 52 CONSTRUCT 54"PIPE BEDDING 219LF $14.00$3,066.00 53 CONSTRUCT 60"PIPE BEDDING 0LF $15.25$0.00 54 CONSTRUCT 18"R.C. FLARED END SECTION 6EA $1,200.00$7,200.00 55 CONSTRUCT 30"R.C. FLARED END SECTION 0EA $1,500.00$0.00 56 CONSTRUCT 36"R.C. FLARED END SECTION 2EA $2,000.00$4,000.00 57 CONSTRUCT 42"R.C. FLARED END SECTION 4EA $2,300.00$9,200.00 58 CONSTRUCT 54"R.C. FLARED END SECTION 4EA $3,000.00$12,000.00 59 CONSTRUCT 60"R.C. FLARED END SECTION 0EA $3,500.00$0.00 60 CONSTRUCT 60"AREA INLET - TYPE II 0EA $4,500.00$0.00 61 CONSTRUCT 54"I.D. FLATTOP MANHOLE 0EA $3,500.00$0.00 62 CONSTRUCT 96"I.D. FLATTOP MANHOLE 0EA $11,000.00$0.00 63 CONSTRUCT 18"R.C. VERTICAL PIPE BEND 0EA $875.00$0.00 64 CONSTRUCT 54"R.C. VERTICAL PIPE BEND 2EA $2,100.00$4,200.00 100% of reimbursement for offsite arterialis GO 8/14/2017 10:35 AM Page 15 of 27 ESTIMATE 0116080 Total.xlsx
Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ 65 STABILIZE TRENCH WITH CRUSHED LIMESTONE 0TN $28.00$0.00 66 CONSTRUCT ROCK RIP-RAP - TYPE "A" 189TN $51.00$9,639.00 67 CONSTRUCT ROCK RIP-RAP - TYPE "B" 0TN $51.00$0.00 68 CONSTRUCT ROCK RIP-RAP - TYPE "C" 300TN $51.00$15,300.00 69 SEEDING - TYPE "B" 9AC $670.00$6,030.00 70 CONSTRUCT SILT FENCE 412LF $2.00$824.00 71 CONSTRUCT STRAW WATTLE SILT CHECK 624LF $2.65$1,653.60 72 CONSTRUCT FLARED END INLET PROTECTION 8EA $113.00$904.00 73 ROLLED EROSION CONTROL, TYPE II 42471SY $0.95$40,347.45 74 PERMANENT PAINTED PAVEMENT MARKING - 5" WHITE SOLID 7448LF $0.32$2,383.36 75 PERMANENT PAINTED PAVEMENT MARKING - 5" YELLOW SOLID 7376LF $0.38$2,802.88 76 PERMANENT PAINTED PAVEMENT MARKING - 5" YELLOW SKIP (BROKEN)1609LF $0.38$611.42 77 PERMANENT PAINTED PAVEMENT MARKING - 10" WHITE SOLID 0LF $0.75$0.00 78 PREFORMED PAVEMENT MARKING TAPE MARKING SYMBOL - WHITE DIRECTIONAL ARROW 4EA $300.00$1,200.00 79 PREFORMED PAVEMENT MARKING TAPE MARKING SYMBOL - WHITE "ONLY" 2EA $245.00$490.00 80 3" CONDUIT (PVC OR HDPE) 229LF $14.50$3,320.50 81 PULL BOX, TYPE PB-6 2EA $700.00$1,400.00 82 BARRICADING 1LS $7,012.00$7,012.00 CONTINGENCY 5% $857,042.76$42,852.14 Estimated Construction Costs: $899,894.90 Estimated Soft Costs 19.00% $170,980.03 2.00% GeotechnicalandTesting: $17,997.90 Total Estimated Costs (Sarpy County): $1,088,872.83 1/3 Total Reimbursable to Sarpy County: $362,957.61 5.00% Engineering: $18,147.88 2.00% Legal: $7,259.15 5.00% Fiscal: $19,418.23 7.00% Interest: $21,408.60 9 Duration(Months) Total Estimated Soft Costs: 13%$48,085.99 Total Estimated Costs: $411,043.59 EngineeringDesignand ConstructionAdministration: 8/14/2017 10:35 AM Page 16 of 27 ESTIMATE 0116080 Total.xlsx

SIDEWALKS

Sidewalkadjacentto outlots

SIDEWALKS-ARTERIALS (FUTURE)

Assume 5' wide sidewalk7' fromedgeof pavement on Capehart.10' trail on 72nd StreetSidewalk will be a future GO project

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.CONSTRUCT 5" CONCRETE SIDEWALK0SF$4.00$0.00 2.CONSTRUCT CONCRETE CURB RAMP0EA$1,000.00$0.00 CONTINGENCY20%$0.00$0.00 Estimated Construction Costs: $0.00 Estimated Soft Costs 19.00% $0.00 1.00% GeotechnicalandTesting: $0.00 5.00% Legal: $0.00 5.00% Fiscal: $0.00 7.00% Interest: $0.00 12 Duration(Months) Total Estimated Soft Costs: 0%$0.00 Total Estimated Costs: $0.00
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.CONSTRUCT 5" CONCRETE SIDEWALK12,950SF$4.00$51,800.00 3.CONSTRUCT CONCRETE CURB RAMP6EA$1,000.00$6,000.00 2CONSTRUCT 5" CONCRETE TRAIL12,700SF$4.00$50,800.00 CONTINGENCY20%$108,600.00$21,720.00 Estimated Construction Costs: $130,320.00 Estimated Soft Costs 19.00% $24,760.80 1.00% GeotechnicalandTesting: $1,303.20 5.00% Legal: $6,516.00 5.00% Fiscal: $8,145.00 7.00% Interest: $11,973.15 12 Duration(Months) Total Estimated Soft Costs: 40%$52,698.15 Total Estimated Costs: $183,018.15 EngineeringDesignand ConstructionAdministration: EngineeringDesignand
8/14/201710:35 AMPage 17 of 27ESTIMATE 0116080 Total.xlsx

2 streetsigns perintersection,assume flutedpost persign

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ SIGNAGE Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1."STOP" SIGN (24")21EA$225.00$4,725.00 2.SPEED LIMIT SIGN (18"X24")5EA$225.00$1,125.00 3.STREET SIGN WITH DECORATIVEBRACKET26EA$330.00$8,580.00 4.12" STOP BAR525LF$5.00$2,625.00 5.DECORATIVE FLUTED POST52EA$360.00$18,720.00 6PEDESTRIAN CROSSING225LF$10.00$2,250.00 CONTINGENCY20%$38,025.00$7,605.00 Estimated Construction Costs: $45,630.00 Estimated Soft Costs 25.00% $11,407.50 1.00% GeotechnicalandTesting: $456.30 5.00% Legal: $2,281.50 5.00% Fiscal: $2,988.77 7.00% Interest: $4,393.48 12 Duration(Months) Total Estimated Soft Costs: 47%$21,527.55 Total Estimated Costs: $67,157.55 EngineeringDesignand
8/14/201710:35 AMPage 18 of 27ESTIMATE 0116080 Total.xlsx

SIDEWALKS G.O.

Allsidewalkand signs shall be GO

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. CONSTRUCT 5"CONCRETE SIDEWALK 0SF $4.00$0.00 2 CONSTRUCT CONCRETE CURB RAMP 0EA $1,000.00$0.00 CONTINGENCY 20% $0.00$0.00 Estimated Construction Costs: $0.00 Estimated Soft Costs 19.00% $0.00 1.00% GeotechnicalandTesting: $0.00 5.00% Legal: $0.00 5.00% Fiscal: $0.00 7.00% Interest: $0.00 12 Duration(Months) Total Estimated Soft Costs: 0%$0.00 Total Estimated Costs: $0.00 EngineeringDesignand ConstructionAdministration:
8/14/2017 10:35 AM Page 19 of 27 ESTIMATE 0116080 Total.xlsx

SIGNAGE G.O.

2 street signs per intersection, assume fluted post per sign. AllGO.

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. "STOP"SIGN (24") 21 EA$225.00$4,725.00 2. SPEED LIMIT SIGN (18"X24") 5 EA$225.00$1,125.00 3. STREET SIGN WITH DECORATIVE BRACKET 26 EA$330.00$8,580.00 4. 12"STOP BAR 525 LF$5.00$2,625.00 5. DECORATIVE FLUTED POST 52 EA$360.00$18,720.00 6 PEDESTRIAN CROSSING 225 LF$10.00$2,250.00 CONTINGENCY 20% $38,025.00$7,605.00 Estimated Construction Costs: $45,630.00 Estimated Soft Costs 25.00% $11,407.50 1.00% GeotechnicalandTesting: $456.30 5.00% Legal: $2,281.50 5.00% Fiscal: $2,988.77 7.00% Interest: $4,393.48 12 Duration(Months) Total Estimated Soft Costs: 47%$21,527.55 Total Estimated Costs: $67,157.55 EngineeringDesignand
Assumptions/Comments:
8/14/2017 10:35 AM Page 20 of 27 ESTIMATE 0116080 Total.xlsx

PARKS AQUISITION

PARKS IMPROVEMENTS

Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. $0.00 Estimated Construction Costs: $0.00 Estimated Soft Costs 0.50% $0.00 5.50% Legal: $0.00 5.00% Fiscal: $0.00 7.00% Interest: $0.00 6 Duration(Months) Total Estimated Soft Costs: 0%$0.00 Total Estimated Costs: $0.00
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. $0.00 Estimated Construction Costs: $0.00 Estimated Soft Costs 19.00% $0.00 1.00% GeotechnicalandTesting: $0.00 5.00% Legal: $0.00 5.00% Fiscal: $0.00 7.00% Interest: $0.00 12 Duration(Months) Total Estimated Soft Costs: 0%$0.00 Total Estimated Costs: $0.00 EngineeringDesignand ConstructionAdministration: EngineeringDesignand ConstructionAdministration: No Parks. 8/14/2017 10:35 AM Page 21 of 27 ESTIMATE 0116080 Total.xlsx

18.

19.

20.

Water layoutneedsto be approved by TD2.Assume 12"spine through projectand assume connecting to 12"offsite water.Alsoassuming valve per leg ofeach tee and cross.

CONSTRUCT 6" x 22.5 DEGREE HORIZONTAL BEND WITH BACKING

CONSTRUCT 8" x 22.5 DEGREE HORIZONTAL BEND WITH BACKING

CONSTRUCT 12" x 22.5 DEGREE HORIZONTAL BEND WITH BACKING

x 45 DEGREE VERTICAL BEND WITH BACKING

8" x 45 DEGREE VERTICAL BEND WITH BACKING

12" x 45 DEGREE VERTICAL BEND WITH BACKING

6" x 22.5 DEGREE VERTICAL BEND WITH BACKING

25.CONSTRUCT 8" x 22.5 DEGREE

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ WATER INTERIOR Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.CONSTRUCT 6" D.I.P.1,950LF$24.00$46,800.00 2.CONSTRUCT 8" D.I.P.7,030LF$28.00$196,840.00 3.CONSTRUCT 12" D.I.P.2,630EA$42.00$110,460.00 4. CONSTRUCT END OF MAIN HYDRANT, GATE VALVE AND TEE ASSEMBLY AND BACKING BLOCK2EA$3,900.00$7,800.00 5.CONSTRUCT HYDRANT, GATE VALVE AND TEE ASSEMBLY21EA$4,000.00$84,000.00 6.CONSTRUCT 8"x8"x6" M.J. TEE ASSEMBLY AND BACKING BLOCK3EA$350.00$1,050.00 7.CONSTRUCT 8"x8"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK4EA$375.00$1,500.00 8.CONSTRUCT 12"x12"x6" M.J. TEE ASSEMBLY AND BACKING BLOCK1EA$425.00$425.00 9.CONSTRUCT 12"x12"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK1EA$475.00$475.00 10.CONSTRUCT 8"x8" CROSS1EA$335.00$335.00 11.CONSTRUCT 12"x8" CROSS1EA$500.00$500.00 12.CONSTRUCT 12"x12" CROSS1EA$550.00$550.00 13.CONSTRUCT 6" M.J. GATE VALVE AND BOX5EA$850.00$4,250.00 14.CONSTRUCT 8" M.J. GATE VALVE AND BOX25EA$1,150.00$28,750.00 15.CONSTRUCT 12" M.J. GATE VALVE AND BOX11EA$2,000.00$22,000.00 16.CONSTRUCT 6" x 45 DEGREE HORIZONTAL BEND WITH BACKING BLOCK2EA$350.00$700.00 17.CONSTRUCT 8" x 45 DEGREE HORIZONTAL BEND WITH BACKING BLOCK2EA$400.00$800.00
BLOCK2EA$300.00$600.00
BLOCK2EA$350.00$700.00
BLOCK2EA$450.00$900.00
BLOCK4EA$500.00$2,000.00
BLOCK12EA$550.00$6,600.00
BLOCK2EA$400.00$800.00
VERTICAL BEND WITH BACKING BLOCK2EA$450.00$900.00 26.CONSTRUCT 12" x 22.5 DEGREE VERTICAL BEND WITH BACKING BLOCK2EA$725.00$1,450.00 27.CONSTRUCT 12" X 6" REDUCER1EA$300.00$300.00 28. CONSTRUCT 12"X12"X12" LIVE TAP TEE ASSEMBLY, 12" M.J. GATE VALVE WITH BOX AND BACKING BLOCK2EA$2,500.00$5,000.00 29.REMOVE 8" PIPE PLUG1EA$400.00$400.00 30.REMOVE 12" PIPE PLUG1EA$500.00$500.00 31.CONNECT TO EXISTING MAIN2EA$500.00$1,000.00 32.CONSTRUCT CHLORINE TUBE4EA$1,200.00$4,800.00 33.CONSTRUCT SAMPLE TAP13EA$250.00$3,250.00 34.CONSTRUCT SILT FENCE1,000LF$3.00$3,000.00 35.SEEDING - TYPE "TEMPORARY SEED MIX"1AC$600.00$600.00 36.STRAWMULCH1AC$600.00$600.00 CONTINGENCY15%$549,035.00$82,355.25 Estimated Construction Costs: $631,990.25 Estimated Soft Costs 21.00% $132,717.95 2.00% GeotechnicalandTesting: $12,639.81 5.00% Legal: $31,599.51 5.00% Fiscal: $40,447.38 7.00% Interest: $44,593.23 9 Duration(Months) Total Estimated Soft Costs: 41%$261,997.88 Total Estimated Costs: $893,988.13 EngineeringDesignand ConstructionAdministration:
21.CONSTRUCT 6"
22.CONSTRUCT
23.CONSTRUCT
BLOCK12EA$750.00$9,000.00 24.CONSTRUCT
8/14/201710:35 AMPage 22 of 27ESTIMATE 0116080 Total.xlsx

WATER-CAPITAL FACILITY FEES-PAPILLION RESIDENTIAL

Assumptions/Comments:

UNIT PRICE IS PER THE CITY OF PAPILLION MASTER FEE SCHEDULE FOR SINGLE FAMILY RESIDENTIAL DEVELOPMENT 2017 AFTER October 1, 2017 fee is $2400

WATER-CAPITAL FACILITY FEES-PAPILLION PARK OR COMMON AREA

Assumptions/Comments:

UNIT PRICE IS PER THE CITY OF PAPILLION MASTER FEE SCHEDULE FOR PARK OR COMMON AREA 2017 AFTER October 1, 2017 fee is $6705

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.RESIDENTIAL (SINGLE FAMILY)181EA$2,285.00$413,585.00 Estimated Construction Costs: $413,585.00 Estimated Soft Costs 0.00% $0.00 2.00% Legal: $8,271.70 5.00% Fiscal: $21,092.84 7.00% Interest: $23,254.85 9 Duration(Months) Total Estimated Soft Costs: 13%$52,619.39 Total Estimated Costs: $466,204.39
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.OUTLOTS A-I10.03AC$6,385.00$64,041.55 Estimated Construction Costs: $64,041.55 Estimated Soft Costs 0.00% $0.00 2.00% Legal: $1,280.83 5.00% Fiscal: $3,266.12 7.00% Interest: $3,600.90 9 Duration(Months) Total Estimated Soft Costs: 13%$8,147.85 Total Estimated Costs: $72,189.40 EngineeringDesignand EngineeringDesignand 8/14/201710:35 AMPage 23 of 27ESTIMATE 0116080 Total.xlsx

WATER INTERIOR G.O.

Pricedifference forwater items greaterthan 8"

19 CONSTRUCT 8" x 22.5 DEGREE HORIZONTAL BEND WITH BACKING

20

CONSTRUCT 12" x 22.5 DEGREE HORIZONTAL BEND WITH BACKING

21CONSTRUCT 6" x 45 DEGREE VERTICAL BEND WITH BACKING BLOCK0EA$500.00$0.00

22CONSTRUCT 8" x 45 DEGREE VERTICAL BEND WITH BACKING

23CONSTRUCT 12" x 45 DEGREE VERTICAL BEND WITH BACKING BLOCK12EA$200.00$2,400.00

24CONSTRUCT 6" x 22.5 DEGREE VERTICAL BEND WITH BACKING BLOCK0EA$400.00$0.00

25CONSTRUCT 8" x 22.5 DEGREE VERTICAL BEND WITH BACKING BLOCK0EA$450.00$0.00

26CONSTRUCT 12" x 22.5 DEGREE VERTICAL BEND WITH BACKING BLOCK2EA$275.00$550.00

27CONSTRUCT 12" X 6" REDUCER1EA$300.00$300.00

CONSTRUCT 12"X12"X12" LIVE TAP TEE ASSEMBLY, 12" M.J. GATE VALVE WITH BOX AND BACKING BLOCK2EA$1,000.00$2,000.00 29REMOVE 8" PIPE PLUG1EA$400.00$400.00

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.CONSTRUCT 6" D.I.P.0LF$24.00$0.00 2CONSTRUCT 8" D.I.P.0LF$28.00$0.00 3CONSTRUCT 12" D.I.P.2,630EA$14.00$36,820.00 4 CONSTRUCT END OF MAIN HYDRANT, GATE VALVE AND TEE ASSEMBLY AND BACKING BLOCK0EA$3,900.00$0.00 5CONSTRUCT HYDRANT, GATE VALVE AND TEE ASSEMBLY0EA$4,000.00$0.00 6CONSTRUCT 8"x8"x6" M.J. TEE ASSEMBLY AND BACKING BLOCK0EA$350.00$0.00 7CONSTRUCT 8"x8"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK0EA$375.00$0.00 8CONSTRUCT 12"x12"x6" M.J. TEE ASSEMBLY AND BACKING BLOCK1EA$75.00$75.00 9CONSTRUCT 12"x12"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK1EA$100.00$100.00 10CONSTRUCT 8"x8" CROSS0EA$335.00$0.00 11CONSTRUCT 12"x8" CROSS1EA$165.00$165.00 12CONSTRUCT 12"x12" CROSS1EA$215.00$215.00 13CONSTRUCT 6" M.J. GATE VALVE AND BOX0EA$850.00$0.00 14CONSTRUCT 8" M.J. GATE VALVE AND BOX0EA$1,150.00$0.00 15CONSTRUCT 12" M.J. GATE VALVE AND BOX11EA$850.00$9,350.00 16CONSTRUCT 6" x 45 DEGREE HORIZONTAL BEND WITH BACKING BLOCK0EA$350.00$0.00 17CONSTRUCT 8" x 45 DEGREE HORIZONTAL BEND WITH BACKING BLOCK0EA$400.00$0.00 18 CONSTRUCT 6" x 22.5 DEGREE HORIZONTAL BEND
KING BLOCK0EA$300.00$0.00
WITH BAC
BLOCK0EA$350.00$0.00
BLOCK2EA$100.00$200.00
BLOCK0EA$550.00$0.00
31CONNECT TO EXISTING MAIN0EA$500.00$0.00 32CONSTRUCT CHLORINE TUBE4EA$1,200.00$4,800.00 33CONSTRUCT SAMPLE TAP13EA$250.00$3,250.00 34CONSTRUCT SILT FENCE1,000LF$3.00$3,000.00 35SEEDING - TYPE "TEMPORARY SEED MIX"1AC$600.00$600.00 36STRAWMULCH1AC$600.00$600.00 CONTINGENCY15%$64,925.00$9,738.75 Estimated Construction Costs: $74,663.75 Estimated Soft Costs 21.00% $15,679.39 2.00% GeotechnicalandTesting: $1,493.28 5.00% Legal: $3,733.19 5.00% Fiscal: $4,778.48 7.00% Interest: $5,268.27 9 Duration(Months) Total Estimated Soft Costs: 41%$30,952.60 Total Estimated Costs: $105,616.35 EngineeringDesignand ConstructionAdministration:
28
30REMOVE 12" PIPE PLUG1EA$100.00$100.00
8/14/201710:35 AMPage 24 of 27ESTIMATE 0116080 Total.xlsx

WATER-CAPITAL FACILITY FEES-PAPILLION G.O.

Assumptions/Comments: 50% OF TOTAL COST G.O.

WATER-CAPITAL FACILITY FEES-PAPILLION PARK OR COMMON AREA

Assumptions/Comments:

ASSUMES 50% OF OPEN AREA IS GO

Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.50% OF TOTAL IS G.O.1LS$233,102.19$233,102.19 Estimated Construction Costs: $233,102.19 Total Estimated Costs: $233,102.19
BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1.50% OF TOTAL IS G.O.1.00LS$36,094.70$36,094.70 Estimated Construction Costs: $36,094.70 Total Estimated Costs: $36,094.70 8/14/201710:35 AMPage 25 of 27ESTIMATE 0116080 Total.xlsx
Shadow Lake 2 0116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ POWER Assumptions/Comments: BidItemDescription ApproximateQuantity Unit UnitPriceTotal 1. SHADOW LAKE 2 RESIDENTIAL LOTS 181 EA$1,350.00$244,350.00 Estimated Construction Costs: $244,350.00 Estimated Soft Costs 19.00% $46,426.50 2.00% Legal: $4,887.00 5.00% Fiscal: $14,783.18 7.00% Interest: $16,298.45 9 Duration(Months) Total Estimated Soft Costs: 34%$82,395.13 Total Estimated Costs: $326,745.13 EngineeringDesignand ConstructionAdministration: 8/14/2017 10:35 AM Page 26 of 27 ESTIMATE 0116080 Total.xlsx
Shadow Lake 20116080.01-003L:\Engineering\0116080 Shadow Lake 2\DESIGN DATA\ Plan Review Fee Assumptions/Comments: Bid Item Description Construction CostPlan Review Fee Total 1.SANITARY SEWER - INTERIOR$908,586.401.00%$9,085.86 2.SANITARY SEWER - OUTFALL$0.001.00%$0.00 3.STORM SEWER INTERIOR$417,465.461.00%$4,174.65 4.PAVING MINOR$1,551,361.051.00%$15,513.61 5.PAVING COLLECTOR$0.001.00%$0.00 6.PAVING MAJOR - 72ND & CAPEHART$899,894.901.00%$8,998.95 7.SIDEWALKS$45,630.001.00%$456.30 8.PARKS IMPROVEMENTS$0.001.00%$0.00 9.WATER INTERIOR$631,990.251.00%$6,319.90 10.WATER OFFSITE$0.001.00%$0.00 Estimated Construction Costs: $44,549.28 Estimated Soft Costs 5.00% Fiscal: $2,227.46 7.00% Interest: $3,274.37 12 Duration (Months) Total Estimated Soft Costs: 12%$5,501.84 Total Estimated Costs: $50,051.12
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.